12.07.2015 Views

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Effective June 16, 2006The planned exploration program for 2007, at <strong>Hackett</strong> <strong>River</strong> is expected to involve:1. Re-opening of the existing camp (on Surface Lease 76F 16-1-4) in late February. The existing camp is located at65° 55’N, 108° 22’W. (see following photos)2. Transport of fuel and drilling supplies to the camp and storing it near the camp.3. Limited ground EM geophysical surveys to accurately locate on the ground the location of previously identifiedgeophysical anomalies.4. Diamond drill testing of the geophysical targets, infill and step-out drilling on the known deposits.5. Transport of drilled core to camp for geological logging, sampling and storage.6. Inspection and reclamation of drill sites upon drill hole completion.7. Sampled core would be sawn with half of the core sent away for assaying.8. Camp clean-up and progressive reclamation.9. Esker airstrip clean-up after each use during spring break-up season.Other project activities planned for the camp (on Surface Lease 76F 16-1-4) in 2007 would include:1. Complete the renovation of the kitchen and camp dry facilities in the existing camp to better accommodateapproximately 25-30 people.2. Construction of approximately 5 wooden core storage racks to hold approximately 15,000 m of drill core.3. Maintenance of the main generator, and maintenance and possible upgrade of the incinerator.4. Reposition 1 of the 4 secondary containment berms to store fuel drums in a more level orientation.5. Finish construction of the bear fence.6. Construct a core logging shed for geotechnical measurements and core photography.The proposed 2007 work program is planned as follows:Task Start Date Completion DateCamp reopening February 20 February 28Geophysics mobilization and anomaly confirmation April 1 September 1Fuel mobilization March 15 May 20Drill crew mobilization and drilling March 1 September 15Crew demobilization and camp clean-up September 15 September 30The plan is to work though the spring break-up season without a break.5. TYPE OF PRIMARY UNDERTAKING (A supplementary questionnaire must be submitted with theapplication for undertakings listed in “bold”) Industrial Mining and Milling(includes exploration/drilling) Municipal (includes camps/lodges) Power Agricultural Conservation Recreational Miscellaneous (describe below):See Schedule II of Northwest Territories Waters Regulations for Description of UndertakingsPage 6 of 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!