- Page 2 and 3: EXECUTIVE SUMMARYTM
- Page 4 and 5: Executive SummaryA summary of the p
- Page 6 and 7: Executive SummaryIdentification of
- Page 8 and 9: TABLE OF CONTENTSTM
- Page 10 and 11: Table of Contents2.4.5.2 Boot Lake
- Page 13 and 14: Table of Contents6.2.4 Birds ......
- Page 15 and 16: Table of Contents9.1.3 Environmenta
- Page 17 and 18: Table of Contents6.2-4 Species of F
- Page 19 and 20: 1. INTRODUCTIONTM
- Page 21 and 22: Ellice RiverAI No. a16725f-EISJob N
- Page 23 and 24: Introduction• Working with the ap
- Page 25 and 26: IntroductionTable 1.3-1Major Permit
- Page 27: IntroductionThe Project does not in
- Page 31 and 32: gis no. 833-2-02 Job No. 833-2 Nove
- Page 33 and 34: gis no. 833-2-03 Job No. 833-2 Nove
- Page 35 and 36: Project Descriptiondrill data, and
- Page 37 and 38: AI No. a18251fJob No. 833-228/11/20
- Page 39 and 40: Project Descriptionchannelways, int
- Page 41 and 42: Project DescriptionThe preliminary
- Page 43 and 44: Project Descriptionbeneath Camp Lak
- Page 45 and 46: Project DescriptionOre and waste fr
- Page 47 and 48: Project Description• Three ore zo
- Page 49 and 50: Project DescriptionElements showing
- Page 51 and 52: AI No. a18252fJob No. 833-228/11/20
- Page 53 and 54: Project DescriptionThe locations of
- Page 55 and 56: Project DescriptionThe airstrip wil
- Page 57 and 58: Project Description• Modular desi
- Page 59 and 60: Project DescriptionTraining, discus
- Page 61 and 62: Project Descriptionoperated as a ze
- Page 63 and 64: Project DescriptionDuring operation
- Page 65 and 66: Project DescriptionStorm water runo
- Page 67 and 68: Project Description• design a hor
- Page 69 and 70: 7315000gis no. 833-2-04 Job No. 833
- Page 71 and 72: Project DescriptionThis solution re
- Page 73 and 74: Project DescriptionInbound cargoes,
- Page 75 and 76: Project DescriptionCopper, zinc and
- Page 77 and 78: Project Descriptionthe other, while
- Page 79 and 80:
3. TRAINING AND EMPLOYMENTTM
- Page 81 and 82:
Table 3.2-1Projected Personnel Need
- Page 83 and 84:
4. DESCRIPTION OF PUBLIC INVOLVEMEN
- Page 85 and 86:
Description of Public Involvement a
- Page 87 and 88:
Description of Public Involvement a
- Page 89 and 90:
5. DESCRIPTION OF TRADITIONAL KNOWL
- Page 91 and 92:
Description of Traditional Knowledg
- Page 93 and 94:
6. Description of the Existing Envi
- Page 95 and 96:
gis no. 833-1-16 Job No. 833-1 Nove
- Page 97 and 98:
Description of the Existing Environ
- Page 99 and 100:
Description of the Existing Environ
- Page 101 and 102:
Description of the Existing Environ
- Page 103 and 104:
Description of the Existing Environ
- Page 105 and 106:
Description of the Existing Environ
- Page 107:
gis no. 833-3-35 Job No. 833-3 Nove
- Page 110 and 111:
Description of the Existing Environ
- Page 112 and 113:
Description of the Existing Environ
- Page 114 and 115:
Description of the Existing Environ
- Page 116 and 117:
Description of the Existing Environ
- Page 118 and 119:
Description of the Existing Environ
- Page 120 and 121:
Description of the Existing Environ
- Page 122 and 123:
Description of the Existing Environ
- Page 124 and 125:
gis no. 833-6-23 Job No. 833-6 Nove
- Page 126 and 127:
gis no. 833-6-25a Job No. 833-6 Oct
- Page 128 and 129:
Description of the Existing Environ
- Page 130 and 131:
Description of the Existing Environ
- Page 132 and 133:
Description of the Existing Environ
- Page 134 and 135:
Description of the Existing Environ
- Page 136 and 137:
Description of the Existing Environ
- Page 138 and 139:
Description of the Existing Environ
- Page 140 and 141:
Description of the Existing Environ
- Page 142 and 143:
Description of the Existing Environ
- Page 144 and 145:
Description of the Existing Environ
- Page 146 and 147:
Description of the Existing Environ
- Page 148 and 149:
Description of the Existing Environ
- Page 150 and 151:
Description of the Existing Environ
- Page 152 and 153:
Description of the Existing Environ
- Page 154 and 155:
gis no. 834-2-01 Job No. 834-2 Nove
- Page 156 and 157:
gis no. 834-4-01 Job No. 834-4 Nove
- Page 158 and 159:
Description of the Existing Environ
- Page 160 and 161:
Description of the Existing Environ
- Page 162 and 163:
Description of the Existing Environ
- Page 164 and 165:
Description of the Existing Environ
- Page 166 and 167:
Description of the Existing Environ
- Page 168 and 169:
Description of the Existing Environ
- Page 170 and 171:
Description of the Existing Environ
- Page 172 and 173:
7. Identification of Potential Envi
- Page 174 and 175:
THE NUNAVUT IMPACT REVIEW BOARDSCRE
- Page 176 and 177:
Identification of Potential Environ
- Page 178 and 179:
Identification of Potential Environ
- Page 180 and 181:
Identification of Potential Environ
- Page 182 and 183:
Identification of Potential Environ
- Page 184 and 185:
Identification of Potential Environ
- Page 186 and 187:
Identification of Potential Environ
- Page 188 and 189:
Identification of Potential Environ
- Page 190 and 191:
Identification of Potential Environ
- Page 192 and 193:
Identification of Potential Environ
- Page 194 and 195:
Identification of Potential Environ
- Page 196 and 197:
Identification of Potential Environ
- Page 198 and 199:
Identification of Potential Environ
- Page 200 and 201:
Identification of Potential Environ
- Page 202 and 203:
Identification of Potential Environ
- Page 204 and 205:
Identification of Potential Environ
- Page 206 and 207:
Identification of Potential Environ
- Page 208 and 209:
Identification of Potential Environ
- Page 210 and 211:
Identification of Potential Environ
- Page 212 and 213:
8. Identification of Potential Cumu
- Page 214 and 215:
Identification of Potential Cumulat
- Page 216 and 217:
Identification of Potential Cumulat
- Page 218 and 219:
9. Environmental PlansAs part of pr
- Page 220 and 221:
Environmental PlansMonitoring progr
- Page 222 and 223:
Environmental PlansThe following in
- Page 224 and 225:
REFERENCESTM
- Page 226 and 227:
ReferencesCOSEWIC. 2002. COSEWIC as
- Page 228 and 229:
ReferencesHealth Canada. 2004. Cana
- Page 230 and 231:
ReferencesNunavut Wildlife Manageme
- Page 232 and 233:
ReferencesSpellerberg, I. F., and T
- Page 234 and 235:
APPENDIX ANIRB SCREENING FORMSTM
- Page 246:
A2 - PART 1 FORM (INUKTITUT)TM
- Page 268 and 269:
A4 - NON-TECHNICAL DESCRIPTION (ENG
- Page 270 and 271:
A5 - NON-TECHNICAL DESCRIPTION (INU
- Page 272 and 273:
ᐃᓗᓕᖏᑦᐃᓪᓗᒥᒃ ᑐ
- Page 274 and 275:
Ayuqnaittukkut Hanayauyughanut Tugh
- Page 276 and 277:
SubmissionsSCREENING PART 2 FORMPRO
- Page 278 and 279:
Project Specific Information Requir
- Page 280 and 281:
Project Specific Information Requir
- Page 282 and 283:
Project Specific Information Requir
- Page 284 and 285:
Project Specific Information Requir
- Page 286 and 287:
Project Specific Information Requir
- Page 288 and 289:
Project Specific Information Requir
- Page 290 and 291:
Project Specific Information Requir
- Page 292 and 293:
Project Specific Information Requir
- Page 294 and 295:
Project Specific Information Requir
- Page 296 and 297:
Project Specific Information Requir
- Page 298 and 299:
Representative Photos of the Hacket
- Page 300 and 301:
Bathurst Port Site looking east.Aer
- Page 302 and 303:
APPENDIX CEXISTING TYPE B WATER LIC
- Page 304 and 305:
Licence Number: 2BE-HAK0709DECISION
- Page 306 and 307:
Licence Number: 2BE-HAK0709Table 1.
- Page 308 and 309:
Licence Number: 2BE-HAK0709“Inspe
- Page 310 and 311:
Licence Number: 2BE-HAK07093. The L
- Page 312 and 313:
Licence Number: 2BE-HAK07093. The L
- Page 314 and 315:
Licence Number: 2BE-HAK07097. If th
- Page 316 and 317:
Licence Number: 2BE-HAK07099. Drill
- Page 318 and 319:
Effective June 16, 2006P.O. BOX 119
- Page 320 and 321:
Effective June 16, 2006Map 2 - Cent
- Page 322 and 323:
Cigar Lake 7305750 626450 NE -60“
- Page 324 and 325:
Effective June 16, 20066. WATER USE
- Page 326 and 327:
Effective June 16, 2006bit by a hig
- Page 328 and 329:
10. PREDICTED ENVIRONMENTAL IMPACTS
- Page 330 and 331:
Effective June 16, 200613. STUDIES
- Page 332:
Effective June 16, 20065. Finish co
- Page 338:
US 380NW3904 Virginia Ave • Cinci