12.07.2015 Views

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

080121-08MN006-Sabina Hackett River Project Proposal ... - NIRB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

IntroductionThe <strong>Project</strong> does not include a winter road (ice bridge), any routine dredging or the installationof moorings.<strong>Sabina</strong> agrees to meet the conditions of the three OS described above and incorporate thesemeasures to protect fish and fish habitat as outlined in the applicable DFO OperationalStatements. A signed letter to that effect is provided below.1.6 Scope of this ReportThe following <strong>Project</strong> <strong>Proposal</strong> has been prepared to meet the information requirements of theNunavut Impact Review Board’s (<strong>NIRB</strong>’s) Screening Part 2 Form <strong>Project</strong> Specific InformationRequirements (PSIR). This form is presented in Appendix A of this document as a conformitytable.Table 1 of <strong>NIRB</strong>’s PSIR, entitled “Identification of Environmental Impacts”, is included inChapter 7 of this document.Completed <strong>NIRB</strong> Part 1 forms in English, Inuktitut, and Inuinnaqtun are included in Appendix Aof this document, along with non-technical project description summaries in English, Inuktitut,and Inuinnaqtun.January 2008 <strong>Hackett</strong> <strong>River</strong> <strong>Project</strong> – <strong>Project</strong> <strong>Proposal</strong> <strong>Sabina</strong> Silver CorporationReport Version B.1 1–8 Rescan Environmental Services Ltd. (Proj. #833-2)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!