12.07.2015 Views

NSERC grants at Laurentian University Subventions du CRSNG `a l ...

NSERC grants at Laurentian University Subventions du CRSNG `a l ...

NSERC grants at Laurentian University Subventions du CRSNG `a l ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1151. continually verifying the capacities, pro<strong>du</strong>ction sche<strong>du</strong>les and cut-offgrade policies of the existing mines; and2. detecting the need for, and the timing of, a major mine reconstruction.Since the cost of developing an underground hard-rock mine can easily exceed$100 million, the global savings achieved through the optimiz<strong>at</strong>ion ofmine size, its pro<strong>du</strong>ction sche<strong>du</strong>le, and its cut-off grade policy cannot beoveremphasized.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!