13.07.2015 Views

Guidelines for Preparing DoD Pest Control Contracts Using ...

Guidelines for Preparing DoD Pest Control Contracts Using ...

Guidelines for Preparing DoD Pest Control Contracts Using ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

February 1997AFPMB TIM #39GPWS-QA Guideare followed and safety procedures are practiced. After the work is completed, spot checks will be madeto ensure the entire facility was treated, trenches and holes have been properly filled, and other clean uprequirements are completed. <strong>Pest</strong> management records will be inspected <strong>for</strong> each treatment at the end ofthe month when the invoice is received, and spot checks will be made during the month as required toverify these records are routinely being completed within 24 hours of per<strong>for</strong>mance. Verify that warrantypaperwork is complete and submitted prior to payment <strong>for</strong> each service.a. Work Evaluation. Quality of work will be evaluated each time work is inspected. An overallgrade <strong>for</strong> quality of work will be assigned at the final inspection of each treatment. When determining theoverall quality of work grade, the QAE must carefully consider the total scope of work required andsubjectively judge whether it has been substantially completed by the Contractor without an inordinateamount of rework being required. Generally, the QAE should grade a treatment satisfactory overall <strong>for</strong>quality of work if there has been no willful departure from the contract, there is no omission of essentialwork, and essentially 95% or more of the total work has been completed without rework being required.If overall quality of work <strong>for</strong> a delivery order is considered unsatisfactory, timeliness must also beconsidered unsatisfactory.b. Evaluation Work Sheets. A grade of either satisfactory (S) or unsatisfactory (U) and a briefdescription of any noted defects will be recorded on the attached EVALUATION WORK SHEET eachtime the work is inspected. A separate work sheet will be used <strong>for</strong> each delivery order. Provide copiesof all negative EVALUATION WORK SHEETs to the Contractor.c. Call Backs. Rework will always be required and must be completed by the Contractor within 24hours unless delays were requested by building occupants. Each treatment selected <strong>for</strong> rework will beinspected and appropriate notations made on the EVALUATION WORK SHEET.9. Analysis of Results. At the end of the month, the QAE will summarize the overall grades assigned <strong>for</strong>all delivery orders completed during the month, and calculate observed defect rates (ODRs) <strong>for</strong> each ofthe work requirements using the following <strong>for</strong>mula:ODR = Number of unsatisfactory overall grades x 100Total number of treatments inspectedFor example:Number of unsatisfactory overall grades <strong>for</strong> timeliness = 1Number of delivery orders inspected = 4ODR <strong>for</strong> timeliness = 1 ÷ 4 x 100 = 25%QA-22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!