13.07.2015 Views

Guidelines for Preparing DoD Pest Control Contracts Using ...

Guidelines for Preparing DoD Pest Control Contracts Using ...

Guidelines for Preparing DoD Pest Control Contracts Using ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

February 1997AFPMB TIM #39GPWS-QA Guidea. If the ODR <strong>for</strong> a work requirement is less than or equal to its MADR, overall per<strong>for</strong>mance of thatrequirement is satisfactory <strong>for</strong> the month. If the ODR is less than ½ the MADR, the QAE shouldrecommend to the COR to notify the Contractor that per<strong>for</strong>mance is excellent and to keep up the goodwork.b. If the ODR <strong>for</strong> a work requirement is greater than its MADR, overall per<strong>for</strong>mance of thatrequirement is unsatisfactory and the QAE should recommend to the COR that a CDR be issued to theContractor, or that stronger action be taken.c. Payment deductions, including liquidated damages, will be calculated using the work requirementweights set <strong>for</strong>th in the PRS table and subtracted from each completed indefinite quantity delivery orderinvoiced by the Contractor.QA-23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!