13.07.2015 Views

Guidelines for Preparing DoD Pest Control Contracts Using ...

Guidelines for Preparing DoD Pest Control Contracts Using ...

Guidelines for Preparing DoD Pest Control Contracts Using ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

February 1997AFPMB TIM #39GPWS-QA GuideQUALITY ASSURANCE PLAN #12SCHEDULED WEED CONTROL1. Contract Requirement. Scheduled Weed <strong>Control</strong>Work RequirementsStandards of Per<strong>for</strong>mancea. Timely Service Service completed as scheduled (Paragraphs C.7.a andC.14)b. Quality Work In con<strong>for</strong>mance with quality standards, control levels,and procedures specified (Paragraph C.14)c. Daily <strong>Pest</strong> Management Records Completed in accordance with <strong>DoD</strong> Service guidance(Attachment J-C6)2. Primary Method of Surveillance. Planned sampling supported by unscheduled inspections andvalidated customer complaints.3. Maximum Allowable Defect Rate (MADR)a. Timely Service 3%b. Quality Work 3%c. Daily <strong>Pest</strong> Management 5%4. Quantity of Work. The quantity of work <strong>for</strong> weed control in lawn areas, which is accomplishedannually in April, will be the number of designated lawn areas shown in Attachment J-C10. The quantityof work <strong>for</strong> vegetation control will equal the number of improved grounds areas which contain fences,poles, posts, pavement cracks, paved ditches, or other items around which the Contractor must maintain avegetation free strip.5. Level of Surveillancea. Lawns. Not applicable.b. Other Areas. The normal level of surveillance will be used initially <strong>for</strong> the contract. Go toincreased surveillance if the ODR <strong>for</strong> quality of work exceeds the MADR during any given month. If onlythe ODR <strong>for</strong> pest records or timeliness exceeds the MADR, consider increasing the level of surveillance<strong>for</strong> those work requirements only. Go to reduced surveillance if the ODR <strong>for</strong> quality of work is less than½ the MADR <strong>for</strong> two consecutive months.QA-64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!