13.07.2015 Views

Guidelines for Preparing DoD Pest Control Contracts Using ...

Guidelines for Preparing DoD Pest Control Contracts Using ...

Guidelines for Preparing DoD Pest Control Contracts Using ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

February 1997AFPMB TIM #39GPWS-QA GuideQUALITY ASSURANCE PLAN #11ORNAMENTAL AND TURF PEST CONTROL1. Contract Requirement. Scheduled and Unscheduled Ornamental and Turf <strong>Pest</strong> <strong>Control</strong>Work RequirementsStandards of Per<strong>for</strong>mancea. Timely Service Service completed as scheduled, or within specifiedperiod after order (Paragraphs C.7.a and C.13)b. Quality Work In con<strong>for</strong>mance with quality standards, control levels,and procedures specified (Paragraph C.13)c. Daily <strong>Pest</strong> Management Records Completed in accordance with <strong>DoD</strong> Componentguidance (Attachment J-C6)2. Primary Method of Surveillancea. Planned sampling supported by unscheduled inspections and validated customer complaints <strong>for</strong>scheduled services.b. 100% inspection of unscheduled services.3. Maximum Allowable Defect Rate (MADR)a. Timely Service 3%b. Quality Work 3%c. Daily <strong>Pest</strong> Management Records 5%4. Quantity of Work. For scheduled services, the quantity of work will be thenumber of treatments scheduled by the Contractor <strong>for</strong> the monthly evaluation period. This quantity willvary considerably from month to month and will depend on the season of the year, as well as the pests tobe controlled. The quantity of work <strong>for</strong> unscheduled services will be the number of treatments ordered tobe completed during the month.QA-56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!