13.07.2015 Views

Guidelines for Preparing DoD Pest Control Contracts Using ...

Guidelines for Preparing DoD Pest Control Contracts Using ...

Guidelines for Preparing DoD Pest Control Contracts Using ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

February 1997AFPMB TIM #39GPWS-QA GuideQUALITY ASSURANCE PLAN #13UNSCHEDULED MISCELLANEOUS PEST CONTROL1. Contract Requirements. Unscheduled Miscellaneous <strong>Pest</strong> <strong>Control</strong> ServicesWork RequirementsStandards of Per<strong>for</strong>mancea. Timely Service Service provided within specified period after order(Paragraph C.15)b. Quality Work In con<strong>for</strong>mance with quality standards, control levels,and procedures specified (Paragraph C.15)c. Daily <strong>Pest</strong> Management Records Completed in accordance with <strong>DoD</strong> Service guidance(Attachment J-C6)2. Primary Method of Surveillance. 100% inspection3. Maximum Allowable Defect Rate (MADR)a. Timely Service 3%b. Quality Work 3%c. Daily <strong>Pest</strong> Management Records 5%4. Quantity of Work. The quantity of work will be the number of services ordered to be completedduring the month.5. Level of Surveillance. Not applicable6. Sample Size. Not applicable7. Sampling Procedures. Not applicable8. Evaluation Procedures. The QAE will evaluate the Contractor's per<strong>for</strong>mance at least once <strong>for</strong> eachservice ordered, normally by determining if control has been achieved immediately after receiving noticethat work is complete. Unscheduled services with several key work phases may require a number ofinspections while the work is in progress, and each service should be periodically inspected while inQA-71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!