13.07.2015 Views

Opus International Consultants (NSW) Pty Ltd - Transport for NSW ...

Opus International Consultants (NSW) Pty Ltd - Transport for NSW ...

Opus International Consultants (NSW) Pty Ltd - Transport for NSW ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Mount Druitt Commuter Car ParkTraffic, <strong>Transport</strong>ation and Access Impact AssessmentTable 11: Lux<strong>for</strong>d Road / Mount Street IntersectionApproach 1:(S)Mount StreetApproach 2: (E)Lux<strong>for</strong>d RoadApproach 3: (W)Lux<strong>for</strong>d RoadPeriod AM PM AM PM AM PMDelayLOSQueueDo Min 23 29 24 18 16 12Option 25 27 23 20 16 13Do Min B C B B B AOption B B B B B ADo Min 37 82 83 111 54 56Option 40 92 89 115 57 56The SCATS data <strong>for</strong> the Lux<strong>for</strong>d Road / Mount Street intersection was unavailable and assuch, the phasing sequence was modelled based on onsite observations. The signal timingswere optimised by SIDRA which gave the queue lengths observed on site which is what themodel was calibrated against. The phasing diagram <strong>for</strong> the intersection is shown in Figure 5–9:Figure 5–9: Lux<strong>for</strong>d Road / Mount Street Phasing Diagram5.2. Other IntersectionsFollowing intersections were proposed to be investigated if the four intersections nearest tothe proposed site were adversely impacted by the car park:Sherbrooke Street & Francis Road;Kurrajong Avenue & Carlisle Avenue;Carlisle Avenue & Lux<strong>for</strong>d Road; andOx<strong>for</strong>d Lane & North Parade.CCPP-0843-RW-7291-F.docx Page 32 of 46Status: Final CDR

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!