13.07.2015 Views

Opus International Consultants (NSW) Pty Ltd - Transport for NSW ...

Opus International Consultants (NSW) Pty Ltd - Transport for NSW ...

Opus International Consultants (NSW) Pty Ltd - Transport for NSW ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MOVEMENT SUMMARYMt DruittNorth Parade / Mount Street IntersectionSignals - Fixed Time Cycle Time = 60 secondsSite: DoMin PM North Pde / MountSt IntersectionMovement Per<strong>for</strong>mance - VehiclesMov ID TurnDemandDeg. Average Level of 95% Back of Queue Prop. Effective AverageFlow HV Satn Delay Service Vehicles Distance Queued Stop Rate Speedveh/h % v/c sec veh m per veh km/hEast: North Pde (E)5 T 367 3.0 0.295 4.9 LOS A 6.2 44.4 0.46 0.40 42.96 R 79 0.0 0.425 36.0 LOS C 3.4 23.8 0.98 0.76 25.6Approach 446 2.5 0.425 10.4 LOS A 6.2 44.4 0.55 0.46 38.3North: Mount St (N)7 L 94 0.0 0.429 20.2 LOS B 2.7 19.2 0.70 0.72 31.99 R 233 0.9 0.688 33.5 LOS C 8.6 61.0 0.99 0.87 25.8Approach 327 0.6 0.689 29.7 LOS C 8.6 61.0 0.90 0.83 27.3West: North Pde (W)10 L 104 1.8 0.232 8.9 LOS A 1.3 9.3 0.30 0.66 31.111 T 632 2.3 0.705 14.2 LOS A 16.4 116.8 0.85 0.77 22.2Approach 736 2.0 0.705 14.6 LOS B 16.4 116.8 0.77 0.51 23.6All Vehicles 1509 1.9 0.705 16.1 LOS B 16.4 116.8 0.74 0.56 30.5Level of Service (Aver. Int. Delay): LOS B. Based on average delay <strong>for</strong> all vehicle movements. LOS Method: Delay (RTA <strong>NSW</strong>).Level of Service (Worst Movement): LOS C. LOS Method <strong>for</strong> individual vehicle movements: Delay (RTA <strong>NSW</strong>).Approach LOS values are based on average delay <strong>for</strong> all vehicle movements.Movement Per<strong>for</strong>mance - PedestriansMov ID DescriptionDemand Average Level of Average Back of Queue Prop. EffectiveFlow Delay Service Pedestrian Distance Queued Stop Rateped/h sec ped m per pedP5 Across N approach 53 14.7 LOS B 0.1 0.1 0.70 0.70All Pedestrians 53 14.7 0.70 0.70Level of Service (Aver. Int. Delay): LOS B. Based on average delay <strong>for</strong> all pedestrian movements. LOS Method: Delay (HCM).Level of Service (Worst Movement): LOS B. LOS Method <strong>for</strong> individual pedestrian movements: Delay (HCM).Processed: Monday, 20 September 2010 11:32:20 a.m. Copyright © 2000-2010 Akcelik & Associates <strong>Pty</strong> <strong>Ltd</strong>SIDRA INTERSECTION 5.0.2.1437www.sidrasolutions.comProject: G:\Other_Clients\<strong>Opus</strong>_Clients\Australia\Sydney\1-C0441.00\Technical\Modelling\Mt Druitt\Mount St -North Pde v2.sip8000051, OPUS INTERNATIONAL CONSULTANTS, FLOATING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!