13.07.2015 Views

Opus International Consultants (NSW) Pty Ltd - Transport for NSW ...

Opus International Consultants (NSW) Pty Ltd - Transport for NSW ...

Opus International Consultants (NSW) Pty Ltd - Transport for NSW ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MOVEMENT SUMMARYMt DruittSouthern Car Park Entrance/ExitGiveway / Yield (Two-Way)Site: AM Mt Druitt Car ParkMovement Per<strong>for</strong>mance - VehiclesMov ID TurnDemandDeg. Average Level of 95% Back of Queue Prop. Effective AverageFlow HV Satn Delay Service Vehicles Distance Queued Stop Rate Speedveh/h % v/c sec veh m per veh km/hWest: North Pde (W)10 L 148 0.0 0.223 6.4 LOS A 0.0 0.0 0.00 0.78 31.111 T 703 2.4 0.223 0.0 LOS A 0.0 0.0 0.00 0.00 50.0Approach 851 2.0 0.223 1.1 LOS A 0.0 0.0 0.00 0.14 45.1All Vehicles 851 2.0 0.223 1.1 NA 0.0 0.0 0.00 0.14 45.1LOS (Aver. Int. Delay): NA. The average intersection delay is not a good LOS measure <strong>for</strong> two-way sign control due to zero delays associatedwith major road movements.Level of Service (Worst Movement): LOS A. LOS Method <strong>for</strong> individual vehicle movements: Delay (RTA <strong>NSW</strong>).Approach LOS values are based on the worst delay <strong>for</strong> any vehicle movement.Processed: Thursday, 16 September 2010 1:33:09 p.m. Copyright © 2000-2010 Akcelik & Associates <strong>Pty</strong> <strong>Ltd</strong>SIDRA INTERSECTION 5.0.2.1437www.sidrasolutions.comProject: G:\Other_Clients\<strong>Opus</strong>_Clients\Australia\Sydney\1-C0441.00\Technical\Modelling\Mt Druitt\Mt Druitt CarPark.sip8000051, OPUS INTERNATIONAL CONSULTANTS, FLOATING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!