Mount Druitt Commuter Car ParkReview of Environmental Factorswill not be affected as determined by a qualified geotechnical engineer prior tocommencement of Designated Works.Selected potentially sensitive buildings and/or structures will first be surveyed prior tocommencement of the Designated Works and again immediately upon completion of theDesignated Works.All property owners of assets to be surveyed, as defined above, will be advised of the scopeand methodology of the survey within a reasonable time (not less than 14 days) prior tocommencement of the surveys and of the process <strong>for</strong> making a claim regarding propertydamage. A copy of the survey(s) will be given to each affected owner. A register of allproperties surveyed will be maintained.A process <strong>for</strong> property owners to make a claim regarding property damage and <strong>for</strong> theresolution of disputed claims will be developed and included in the CEMP. Any damage tobuildings, structure, lawns, trees, sheds, gardens etc. as a result of any construction activitydirect and indirect (i.e. including vibration and groundwater changes) will be rectified at nocost to the owner(s).Climate change and sustainabilityEach stage of design will meet the minimum percentage requirements as specified in TCA‘sSustainable Design Guidelines 2009A maximum of concrete and steel will be recycled from the demolished structure and used inconstruction where possible.A Climate Change Impact Assessment, including a carbon footprint of the construction of theproject, will be undertaken during detailed design.CommunicationsA Community Liaison Plan (CLP) will be established prior to construction commencing. The CLPwill be implemented throughout the delivery of the project and will include but not be limitedto:identification of community, commuters and other stakeholders to be in<strong>for</strong>med/consultedas part of the projectdetails of procedures and mechanisms that would be used to regularly in<strong>for</strong>m thecommunity, commuters and other stakeholdersdetails of how directly affected property owners will be consultedprocesses to receive and manage feedback and complaintsproject phone, email and mail contact details 9including 24 hour contact number <strong>for</strong>urgent enquiries and complaints)7.3. Licensing and approvalsAll licences and approvals required to undertake the works are listed in Table 7-2.These approvals are legislative requirements necessary <strong>for</strong> the delivery of theProposal.Table 7-2 Licence and approval requirementsRequirementGive written notice of the intention to carry outthe development to adjacent land owners(ISEPP cl.13 (2)).Timing21 days prior to commencement ofconstruction.KMH-2010123a REF Rev 4 doc. Page 82 of 116Status: Final

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!