Measurement<br />

doc.<br />

should<br />

be created<br />

for notif.<br />

Capacity<br />

situation<br />

is to<br />

be evaluated<br />

Capacity<br />

Planning<br />

Capacity<br />

is available<br />

Maintenance<br />

tasks<br />

are to<br />

be processed<br />

Archiving<br />

carried<br />

out<br />

Maintenance<br />

order<br />

is released<br />

Capacity<br />

Leveling<br />

or Planning<br />

Is Performed<br />

Notification<br />

is to<br />

be processed<br />

by planner<br />

group<br />

Material<br />

reservation<br />

can be<br />

withdrawn<br />

Maintenance Order<br />

Maintenance notification type<br />

requirement is to supports<br />

has arisen be generated automatic<br />

from maintenance generation order of a notification<br />

Notification<br />

Maintenance Maintenance<br />

Technical Maintenance order order Maintenance<br />

Notification<br />

findings tasks to be is to requirement<br />

is printed<br />

are entered are determined created be created has arisen<br />

directly from maintenance notification manually<br />

2) OR-exit<br />

to loop<br />

Material<br />

is issued<br />

Material<br />

withdrawal<br />

is to<br />

be posted<br />

Material<br />

Movements<br />

Equipment<br />

must<br />

be installed,<br />

dismantled<br />

or modified<br />

Goods<br />

issue<br />

is posted<br />

Order<br />

Functional<br />

location<br />

is processed<br />

Modification<br />

of Technical<br />

Systems<br />

Equipment<br />

is installed,<br />

dismantled<br />

or modified<br />

Material<br />

is not<br />

available<br />

Equipment<br />

is processed<br />

Retrograde<br />

withdrawal<br />

to be<br />

posted<br />

Purchase<br />

requisition<br />

without<br />

source<br />

of supply created<br />

Technical<br />

findings<br />

are entered<br />

Maintenance<br />

order<br />

is printed<br />

4) OR-OR-<br />

XOR-Delta<br />

Service<br />

is accepted<br />

Completion<br />

Operations<br />

confirmations Services<br />

and Order<br />

of time are to<br />

Must<br />

to be be entered<br />

Be Confirmed<br />

created using time sheet<br />

Capacity<br />

load<br />

is updated<br />

1) OR-split<br />

XOR-join<br />

mismatch<br />

Completion<br />

Confirmation<br />

Actual<br />

costs<br />

are updated<br />

to maintenance<br />

order<br />

Working<br />

hours<br />

data<br />

was analyzed<br />

Maintenance<br />

order<br />

is partially<br />

confirmed<br />

Individual<br />

operations<br />

are confirmed<br />

5) AND might<br />

not get control<br />

from OR<br />

3) AND might<br />

not get control<br />

from XOR<br />

Maintenance<br />

order<br />

is confirmed<br />

completely<br />

Settlement<br />

and Completion<br />

Open<br />

Maintenance<br />

Capacity Open<br />

purchase<br />

order<br />

requirement material<br />

requisitions<br />

is completed<br />

records reservations<br />

for non-stock<br />

with<br />

are deleted are deleted<br />

material are deleted<br />

time reference<br />

Order<br />

Should<br />

Be Technically<br />

Completed<br />

Figure A.40: Plant Maintenance – Breakdown Maintenance Processing (reduced size 9)<br />

Archiving<br />

carried<br />

out<br />

263