03.12.2012 Views

xoEPC - Jan Mendling

xoEPC - Jan Mendling

xoEPC - Jan Mendling

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

326 B. EPCs not completely reduced<br />

Service Service Default Service<br />

order order values order<br />

to be should for service to be<br />

created be created product created<br />

for service notification per maint. itemare<br />

maintained from sales order item<br />

Capacity<br />

requirement<br />

is created<br />

Service<br />

Capacity<br />

Order<br />

order<br />

situation<br />

is to<br />

is created<br />

is to<br />

be performed<br />

and released<br />

be evaluated<br />

Material<br />

reservation<br />

is created<br />

Service<br />

order<br />

is to<br />

be released<br />

Service<br />

order<br />

is released<br />

Service<br />

Order<br />

Creation<br />

and Processing<br />

Service<br />

Order<br />

Release<br />

Order<br />

is to<br />

be performed<br />

Service<br />

Order<br />

Execution<br />

Service<br />

product<br />

exists<br />

Completion<br />

Operations<br />

confirmations Services<br />

and Order<br />

of time are to<br />

Must<br />

to be be entered<br />

Be Confirmed<br />

created using time sheet<br />

General<br />

maintenance<br />

task<br />

list<br />

is processed<br />

Material Material<br />

Material<br />

components components External<br />

components<br />

are assigned are copied procurement<br />

are assigned<br />

via maintenance from is provided<br />

directly<br />

BOM maintenance task list<br />

Service<br />

order<br />

is created<br />

Capacity<br />

is available<br />

Service<br />

order<br />

should<br />

be created<br />

manually<br />

Purchase Purchase<br />

requisition requisition<br />

without with<br />

source vendor<br />

of supply created has been created<br />

Material<br />

components<br />

are to<br />

be assigned<br />

to the operation<br />

Material<br />

Planning<br />

Capacity<br />

Leveling<br />

or Planning<br />

Is Performed<br />

Goods<br />

issue<br />

is posted<br />

Material<br />

withdrawal<br />

is to<br />

be posted<br />

Material<br />

withdrawal<br />

is not<br />

required<br />

Material<br />

BOM is<br />

processed<br />

Material<br />

withdrawal<br />

is not<br />

required<br />

Purchase<br />

requisitions<br />

can be<br />

ordered<br />

Master<br />

data<br />

input<br />

is not<br />

required<br />

Permit<br />

is to<br />

be assigned<br />

Service<br />

Order<br />

Permit<br />

Permits<br />

Issued<br />

Credit Credit<br />

limit limit<br />

check check<br />

is to is to<br />

be performed be manually performed automatically<br />

Permits<br />

are assigned<br />

to the<br />

order<br />

Material<br />

withdrawal<br />

is to<br />

be posted<br />

Order<br />

papers<br />

are to<br />

be printed<br />

Shop<br />

papers<br />

are to<br />

be printed<br />

from order<br />

Notification<br />

and order<br />

assigned<br />

to one<br />

another<br />

Warranty<br />

is to<br />

be checked<br />

Release<br />

is refused<br />

Shop<br />

papers<br />

are to<br />

be printed<br />

from notification<br />

Figure B.11: Customer Service – Repairs Processing at Customer (Field Service) – Service<br />

Order (reduced size 11, unsound)<br />

Material<br />

reservation<br />

can be<br />

withdrawn<br />

Service<br />

Order<br />

Printing<br />

Maintenance<br />

order<br />

is printed<br />

Order<br />

papers<br />

are to<br />

be printed

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!