Capacity<br />

situation<br />

is to<br />

be evaluated<br />

Maintenance<br />

order<br />

is released<br />

Material<br />

reservation<br />

can be<br />

withdrawn<br />

Maintenance<br />

Planning<br />

Technical<br />

findings<br />

are entered<br />

Maintenance<br />

plan<br />

is to<br />

be scheduled<br />

automatically<br />

Order<br />

Maintenance<br />

plan<br />

is created<br />

Service Maintenance<br />

Maintenance Task<br />

Maintenance<br />

entry order<br />

notification List<br />

Maintenance<br />

plan<br />

sheet to be<br />

is to Assigned<br />

call<br />

calls<br />

to be created<br />

be created to Maintenance<br />

waits<br />

are processed<br />

created for each mainte per nance maintenance item item for each mainten ance itemItem<br />

Measurement<br />

doc.<br />

should<br />

be created<br />

for notif.<br />

Capacity<br />

Planning<br />

Maintenance Main tenance Schedule<br />

plan plan counter<br />

is to to be reading<br />

be scheduled sch eduled mtce<br />

manually according to maintenance strategy plan<br />

Maintenance<br />

tasks<br />

are to<br />

be processed<br />

Archiving<br />

carried<br />

out<br />

Capacity<br />

Capacity Leveling<br />

is available or Planning<br />

Is Performed<br />

Notification<br />

is to<br />

be p rocessed<br />

by planner<br />

group<br />

Notification<br />

is printed<br />

Material<br />

is issued<br />

Worklist<br />

Maintenance<br />

requirement<br />

has a risen<br />

Notificatio n<br />

2) OR-exit<br />

to loop<br />

Material<br />

withdra wal<br />

is to<br />

be posted<br />

Material<br />

Movements<br />

Maintenance<br />

plan<br />

released<br />

triggered<br />

Equipment<br />

must<br />

be installed,<br />

dismantled<br />

or modified<br />

Goods<br />

issue<br />

is posted<br />

Functional<br />

Equipment<br />

location<br />

is processed<br />

is pro cessed<br />

Material<br />

is not<br />

ava ilable<br />

Retrograde<br />

withdrawa l<br />

to be<br />

posted<br />

Maintenance<br />

Costs<br />

Determined<br />

Maintenance Order<br />

Notifications notification type<br />

Combined is to supports<br />

in Order be generated automatic<br />

from mainte nance generation order of a notification<br />

Maintenance Maintenance<br />

Maintenance order order<br />

tasks is to to be<br />

are determined b e created created<br />

for maintenance notification per maintena nce item<br />

Modification<br />

of Te chnical<br />

Systems<br />

Equipment<br />

is installed,<br />

dismantled<br />

or modified<br />

Technical<br />

findings<br />

are entered<br />

Maintenance<br />

order<br />

is to<br />

be created<br />

ma nually<br />

Service<br />

is accepted<br />

Maintenance<br />

requirement<br />

has arisen<br />

Purchase<br />

Completion<br />

Operations<br />

requisition Maintenance<br />

confirmations Services<br />

and Order<br />

without order<br />

of time are to<br />

Must<br />

source is printed<br />

to be be entered<br />

Be Confirmed<br />

of supply created<br />

created using time sheet<br />

4) OR-OR-<br />

XOR-Delta<br />

1) OR-split<br />

XOR-join<br />

mismatch<br />

Completion<br />

Confirmation<br />

3) AND might<br />

not get control<br />

from XOR<br />

Actual<br />

Working Maintenance<br />

Maintenance Order<br />

Capacity costs<br />

Individual<br />

hours order<br />

order Should<br />

load are updated<br />

operations<br />

data is partially<br />

is confirmed Be Technically<br />

is updated to maintenance<br />

are confirmed<br />

was analyzed confirmed<br />

completely Completed<br />

order<br />

5) AND might<br />

not get control<br />

from OR<br />

Settle ment<br />

and Completion<br />

Open<br />

Maintenance<br />

Capacit y Open<br />

p urchase<br />

order Archiving<br />

requirement material<br />

requisitions<br />

is completed carried<br />

records reservations<br />

for non-stock<br />

with<br />

out<br />

are delet ed are deleted<br />

material are deleted<br />

time reference<br />

Figure A.44: Plant Maintenance – Planned Maintenance Processing (reduced size 9)<br />