03.12.2012 Views

xoEPC - Jan Mendling

xoEPC - Jan Mendling

xoEPC - Jan Mendling

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

272 A. Errors found with <strong>xoEPC</strong><br />

Maintenance<br />

order<br />

is released<br />

Capacity<br />

is available<br />

Capacity<br />

situation<br />

is to<br />

be evaluated<br />

Capacity<br />

Planning<br />

Refurbishment<br />

Maintenance Maintenance<br />

Repairable<br />

order<br />

order order<br />

spare<br />

for material/<br />

is to is to<br />

is to<br />

equipment<br />

be created be created<br />

be refurbished<br />

is to be created for maintenance notification manually<br />

3) OR-exit to loop<br />

Capacity<br />

Leveling<br />

or Planning<br />

Is Performed<br />

Material<br />

reservation<br />

can be<br />

withdrawn<br />

2) OR-split XOR-join mismatch<br />

Goods<br />

issue<br />

is posted<br />

Order<br />

Material<br />

withdrawal<br />

is to<br />

be posted<br />

Goods<br />

Movements<br />

Material<br />

is issued<br />

Retrograde<br />

withdrawal<br />

to be<br />

posted<br />

Maintenance<br />

requirement<br />

has arisen<br />

Withdrawal Purchase<br />

Completion<br />

Operations<br />

of the requisition Maintenance<br />

confirmations Services<br />

and Order<br />

repairable without order<br />

of time are to<br />

Must<br />

spare source is printed<br />

to be be entered<br />

Be Confirmed<br />

to be refurbished is to of be supply postedcreated<br />

created using time sheet<br />

8) OR-entry<br />

to loop<br />

6) AND-exit<br />

to loop<br />

1) OR-split XOR-join mismatch<br />

7) OR-OR-XOR Delta<br />

Service<br />

is accepted<br />

5) OR-exit to loop<br />

Goods<br />

Receipt<br />

Posted<br />

Material<br />

is not<br />

available<br />

Capacity<br />

load<br />

is updated<br />

Completion<br />

Confirmation<br />

Actual<br />

costs<br />

are updated<br />

to maintenance<br />

order<br />

Working<br />

hours<br />

data<br />

was analyzed<br />

Maintenance<br />

order<br />

is partially<br />

confirmed<br />

Individual<br />

operations<br />

are confirmed<br />

9) AND might<br />

not get control<br />

from OR<br />

4) AND might<br />

not get control<br />

from XOR<br />

Maintenance<br />

order<br />

is confirmed<br />

completely<br />

Settlement<br />

and Completion<br />

Refurbished Open<br />

Maintenance<br />

Capacity Open<br />

repairable purchase<br />

order<br />

requirement material<br />

spare requisitions<br />

is completed<br />

records reservations<br />

is to for non-stock<br />

with<br />

are deleted are deleted<br />

be posted into the warehouse material are deleted<br />

time reference<br />

Order<br />

Should<br />

Be Technically<br />

Completed<br />

Figure A.49: Plant Maintenance – Refurbishment Processing in Plant Maintenance (reduced<br />

size 7)<br />

Archiving<br />

carried<br />

out

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!