03.12.2012 Views

xoEPC - Jan Mendling

xoEPC - Jan Mendling

xoEPC - Jan Mendling

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

List of Figures vii<br />

4.15 Reduction of structured start and end components . . . . . . . . . . . . . 125<br />

4.16 Financial Accounting – Funds Management – Budget Execution . . . . . 127<br />

4.17 Reduction of unstructured start and end components, not on cycle . . . . 128<br />

4.18 Reduction of unstructured start and end components, not on cycle . . . . 130<br />

4.19 Reduction of Delta Components . . . . . . . . . . . . . . . . . . . . . . 132<br />

4.20 Reduction of XOR Delta Components . . . . . . . . . . . . . . . . . . . 133<br />

4.21 Reduction of AND Delta Components . . . . . . . . . . . . . . . . . . . 133<br />

4.22 Reduction of OR Delta Components . . . . . . . . . . . . . . . . . . . . 134<br />

4.23 Reduction of Prism Components . . . . . . . . . . . . . . . . . . . . . . 137<br />

4.24 Connector Merge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 138<br />

4.25 Stepwise reduction of the Loan Request EPC . . . . . . . . . . . . . . . 141<br />

4.26 <strong>xoEPC</strong> inputs and outputs . . . . . . . . . . . . . . . . . . . . . . . . . . 143<br />

4.27 Snapshot of an SVG generated by <strong>xoEPC</strong> for the Plant Maintenance –<br />

Refurbishment Processing in Plant Maintenance EPC . . . . . . . . . . . 144<br />

4.28 Processing time for reducing an EPC . . . . . . . . . . . . . . . . . . . . 146<br />

4.29 Size of reduced EPCs . . . . . . . . . . . . . . . . . . . . . . . . . . . . 147<br />

4.30 Number of Reduction Rule Applications (on logarithm scale) . . . . . . . 148<br />

4.31 Two input component (not sound) . . . . . . . . . . . . . . . . . . . . . 149<br />

4.32 Three input component (not sound) . . . . . . . . . . . . . . . . . . . . . 149<br />

4.33 Acyclic two input two output component (sound) . . . . . . . . . . . . . 149<br />

4.34 Cyclic two input two output component (not sound) . . . . . . . . . . . . 149<br />

4.35 Number of Errors per Type . . . . . . . . . . . . . . . . . . . . . . . . . 150<br />

4.36 Recruitment – Recruitment – Recruitment Request Monitoring . . . . . . 151<br />

4.37 Plant Maintenance – Refurbishment Processing in Plant Maintenance . . 153<br />

5.1 Cyclomatic number of an EPC without concurrency . . . . . . . . . . . . 167<br />

5.2 Two EPCs of the same size with different diameter . . . . . . . . . . . . 178<br />

5.3 Two EPCs of the same average and maximum connector degree and varying<br />

density and CNC values . . . . . . . . . . . . . . . . . . . . . . . . . 181

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!