Supply, Installation, Configuration & Integration of IT infrastructure <strong>for</strong> State Data Center, e-Secretariat<br />
& Other Projects [NIB No. F5(776)/DoIT/Tech/13/I/10766/2013 dated 23-08-2013]<br />
sub-assemblies, spares, etc. with genuine OEM components to make the system<br />
functional/ operational as per SLA. This also involves software assurance services as<br />
per ‘Software Assurance Services’ clause.<br />
b) provide a helpdesk number, email address so that end-user may report problems, if<br />
any, using any of the available methods.<br />
B. Project Activity, Deliverables& Timelines<br />
The milestones, deliverables and time schedule <strong>for</strong> the implementation of the project would be<br />
as follows:-<br />
a) The time specified <strong>for</strong> delivery and other activities as mentioned in the table below shall be<br />
deemed to be the essence of the contract and the SI shall arrange supplies and provide<br />
the required services within the specified period.<br />
b) It should be noted that any delay in the project timelines shall attract Liquidated Damages<br />
(LD) to the SI as per the details mentioned in subsequent sections of this bidding<br />
document.<br />
c) “T” is the event marking DoIT&C issuing the work order to the selected bidder i.e. SI.<br />
S. Milestone/<br />
No. Phase<br />
1. Implementation<br />
Phase<br />
2. Testing &<br />
Commissioning<br />
Phase<br />
Scope of Work Deliverables Timelines<br />
(T=Date of WO)<br />
Implementation Delivery Challan<br />
T+60 days<br />
(as per Clause OEM Warranty<br />
A-1 of SoW) Certificates <strong>for</strong> Hardware<br />
items<br />
OEM Software Support /<br />
Assurance Certificate<br />
Inspection Report by<br />
Testing &<br />
Commissioning<br />
(as per Clause<br />
A-2 of SoW)<br />
DoIT&C<br />
Installation Reports<br />
Acceptance Test Report<br />
by DoIT&C<br />
T+ 75days<br />
3. Support<br />
Services<br />
Phase<br />
Support Service<br />
(as per Clause<br />
A-3 of SoW &<br />
Warranty and<br />
support clause)<br />
Quarterly SLA attainment<br />
reports<br />
After end of each<br />
quarter <strong>for</strong> support<br />
period<br />
Page 14 of 88