Supply, Installation, Configuration & Integration of IT infrastructure <strong>for</strong> State Data Center, e-Secretariat<br />
& Other Projects [NIB No. F5(776)/DoIT/Tech/13/I/10766/2013 dated 23-08-2013]<br />
3. PRE-QUALIFICATION/ ELIGIBILITY CRITERIA<br />
1) A bidder participating in the procurement process shall possess the following minimum prequalification/<br />
eligibility criteria.<br />
S.<br />
No.<br />
Basic<br />
Requirement<br />
Specific Requirements<br />
1 Legal Entity The bidder should be a Proprietorship firm duly<br />
registered either under the <strong>Rajasthan</strong> Shops &<br />
Commercial Establishments Act, 1958 or any other Act<br />
of State/ Union, as applicable <strong>for</strong> dealing in the subject<br />
matter of procurement<br />
(Note: A self-certified declaration regarding the nonapplicability<br />
of registration to any Act should be<br />
submitted by the bidder)<br />
OR<br />
A company registered under Indian Companies Act,<br />
1956<br />
OR<br />
A partnership firm registered under Indian Partnership<br />
Act, 1932.<br />
2 Financial: Annual Turnover of the bidder from IT/ ITeS(as per the<br />
Turnover from last published audited balance sheets)during each of<br />
IT/ ITeS the three financial years i.e. from FY 2009-10 to FY<br />
2011-12 should as follows:<br />
For Package A: Rs. 68.00 Lakhs<br />
For Package B: Rs. 51.00Lakhs<br />
For Package C: Rs. 90.00Lakhs<br />
For Package D: Rs. 72.50 Lakhs<br />
Note: if the bidder is bidding <strong>for</strong> more than one<br />
package, then it shall have the cumulative turnover<br />
3 Financial: Net<br />
Worth<br />
4 Technical<br />
Capability<br />
required <strong>for</strong> those packages<br />
The net worth of the bidder as on 31-03-2012 should<br />
be Positive.<br />
The bidder must have executed work order(s) as per<br />
following details:<br />
Bid <strong>for</strong> Scope of Work of Minimum WO value (<strong>for</strong><br />
Package<br />
completion certificate<br />
Work Order (WO) which satisfactory work<br />
is<br />
A Supply, Installation<br />
& commissioning<br />
of Networking<br />
Items including L2<br />
switch or SAN<br />
switch<br />
B Supply of<br />
Hardware Items<br />
C<br />
Supply, <strong>installation</strong><br />
and configuring of<br />
system software<br />
including OS /<br />
RDBMS (on<br />
servers)<br />
required)<br />
One WO of Rs.21.80 Lakhs<br />
or<br />
Two WO totalling Rs.27.21<br />
Lakhs<br />
One WO of Rs. 16.30<br />
Lakhs<br />
or<br />
Two WO totalling Rs. 20.40<br />
Lakhs<br />
One WO of Rs.28.70 Lakhs<br />
or<br />
Two WO totalling Rs. 35.82<br />
Lakhs<br />
Documents<br />
Required<br />
- Copy of valid<br />
Registration<br />
Certificates<br />
- Self-certified<br />
declaration (if<br />
applicable)<br />
- Copy of<br />
Certificates of<br />
incorporation<br />
CA Certificate with<br />
CA’s Registration<br />
Number/ Seal<br />
CA Certificate with<br />
CA’s Registration<br />
Number/ Seal<br />
Satisfactory Work<br />
Completion<br />
Certificates from<br />
the client; OR<br />
Work Order + Self<br />
Certificate of<br />
Completion<br />
(Certified by the<br />
Statutory Auditor);<br />
OR<br />
Work Order +<br />
Phase Completion<br />
Certificate from<br />
the client<br />
[Note: WO <strong>for</strong><br />
package A & C<br />
must include<br />
<strong>installation</strong> in the<br />
scope of work]<br />