Supply, Installation, Configuration & Integration of IT infrastructure <strong>for</strong> State Data Center, e-Secretariat<br />
& Other Projects [NIB No. F5(776)/DoIT/Tech/13/I/10766/2013 dated 23-08-2013]<br />
g) Payment in case of those goods which need testing shall be made only when such tests<br />
have been carried out, test results received con<strong>for</strong>ming to the prescribed specification.<br />
h) Any liquidated damages/ penalties, as applicable, <strong>for</strong> delay and non-per<strong>for</strong>mance, as<br />
mentioned in this bidding document, will be deducted from the payments <strong>for</strong> the respective<br />
milestones.<br />
i) Taxes, as applicable, will be deducted/ paid as per the prevalent rules and regulations.<br />
j) In case of Site not ready, the payment to the supplier shall be released <strong>for</strong> actual number<br />
of items installed and commissioned under respective lot. The payment <strong>for</strong> rest of the items<br />
which are not installed and commissioned by the supplier shall be released only after their<br />
<strong>installation</strong> and commissioning at the respective site.<br />
2) Service Level Standards/ Requirements/Agreement:<br />
a) Service level requirements<br />
i. Service level plays an important role in defining the Quality of Services (QoS). The<br />
ii.<br />
prime objective of service levels is to ensure high quality of services from selected<br />
bidder, in a efficient manner to the identified users under this procurement.<br />
The service level shall be tracked on a periodic basis i.e. quarterly and have penalty<br />
clauses on non-adherence to any of them. The bidder shall submit reports on all the<br />
service levels to the Purchaser in accordance with the specified <strong>for</strong>mats and reporting<br />
periods and provide clarification, if required. The service levels defined below provide<br />
<strong>for</strong> target level of services required, measurements thereof and associated penalties.<br />
S.No. Services<br />
Description<br />
1. The IT<br />
Infrastructure<br />
shall be kept<br />
up and<br />
running<br />
2. The IT<br />
Infrastructure<br />
shall be kept<br />
up and<br />
running<br />
iii.<br />
Measurement<br />
Parameter<br />
Repair Time<br />
<strong>for</strong> IT<br />
Infrastructure<br />
deployed at<br />
SDC<br />
Repair Time<br />
<strong>for</strong> IT<br />
Infrastructure<br />
deployed<br />
outside SDC<br />
at Secretariat/<br />
Yojna Bhawan<br />
/Other Offices<br />
in Jaipur<br />
Service<br />
Level<br />
Within 24<br />
hours of<br />
lodging<br />
the<br />
complaint<br />
Within<br />
next 16<br />
working<br />
hours<br />
Penalty<br />
0.5% of the<br />
item cost<br />
every hour<br />
after lapse of<br />
24 hours<br />
1% of the<br />
item cost<br />
every 8<br />
working<br />
hours after<br />
lapse of initial<br />
16working<br />
hours<br />
Remarks<br />
Penalty <strong>for</strong> an item<br />
shall not be more than<br />
the total cost of the<br />
item.<br />
Maximum applicable<br />
penalty shall not<br />
exceed total gross<br />
payable amount <strong>for</strong><br />
the quarter.<br />
Maximum applicable<br />
penalty shall not<br />
exceed 10% of the<br />
total order value in the<br />
contract period.<br />
Occurrence of any of the following events may be considered as default and may lead<br />
to further actions under condition i (b) of clause 38 (a)-Termination by Default of<br />
Chapter-6: General Terms and Conditions of Tender & Contract:<br />
a. Applicable penalty on any item is reached equal to the cost of the item, or<br />
Page 58 of 88