7) Scope of Supply<br />

Supply, Installation, Configuration & Integration of IT infrastructure <strong>for</strong> State Data Center, e-Secretariat<br />

& Other Projects [NIB No. F5(776)/DoIT/Tech/13/I/10766/2013 dated 23-08-2013]<br />

a) Subject to the provisions in the bidding document and contract, the goods and related<br />

services to be supplied shall be as specified in the bidding document.<br />

b) Unless otherwise stipulated in the Contract, the scope of <strong>supply</strong> shall include all such<br />

items not specifically mentioned in the Contract but that can be reasonably inferred from<br />

the Contract as being required <strong>for</strong> attaining delivery and completion of the goods and<br />

related services as if such items were expressly mentioned in the Contract.<br />

c) The bidder shall not quote and <strong>supply</strong> and hardware/ software that is likely to be declared<br />

as End of Sale in next 3 months and End of Service/ Support <strong>for</strong> a period of 5 years from<br />

the last date of bid submission. OEMs are required to mention this in the MAF <strong>for</strong> all the<br />

quoted hardware/ software. If any of the hardware/ software is found to be declared as<br />

End of Sale/ Service/ Support, then the bidder shall replace all such hardware/ software<br />

with the latest ones having equivalent or higher specifications without any financial<br />

obligation to the purchaser.<br />

8) Delivery& Installation<br />

a) Subject to the conditions of the contract, the delivery of the goods and completion of the<br />

related services shall be in accordance with the delivery and completion schedule<br />

specified in the bidding document. The details of <strong>supply</strong>/ shipping and other documents<br />

to be furnished by the successful/ selected bidder are specified in the bidding document<br />

and/ or contract.<br />

b) The contract <strong>for</strong> the <strong>supply</strong> can be repudiated at any time by the purchase officer, if the<br />

supplies are not made to his satisfaction after giving an opportunity to the bidder of being<br />

heard and recording the reasons <strong>for</strong> repudiation.<br />

c) The Supplier/ Selected Bidder shall arrange to <strong>supply</strong>, install and commission the<br />

ordered materials/ system as per specifications within the specified delivery/ completion<br />

period at various departments and/ or their offices/ locations mentioned in the PO/ WO.<br />

d) Shifting the place of Installation: The user will be free to shift the place of <strong>installation</strong><br />

within the same city /town/ district/ division. The successful/ selected bidder shall provide<br />

all assistance, except transportation, in shifting of the equipment. However, if the<br />

city/town is changed, additional charges of assistance in shifting and providing<br />

maintenance services <strong>for</strong> remaining period would be decided mutually.<br />

9) Supplier’s/ Selected Bidder’s Responsibilities<br />

The Supplier/ Selected Bidder shall <strong>supply</strong> all the goods and related services included in the<br />

scope of <strong>supply</strong> in accordance with the provisions of bidding document and/ or contract.<br />