29.08.2015 Views

Final RFP for supply, installation, configuration ... - DOITC Rajasthan

Final RFP for supply, installation, configuration ... - DOITC Rajasthan

Final RFP for supply, installation, configuration ... - DOITC Rajasthan

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Supply, Installation, Configuration & Integration of IT infrastructure <strong>for</strong> State Data Center, e-Secretariat<br />

& Other Projects [NIB No. F5(776)/DoIT/Tech/13/I/10766/2013 dated 23-08-2013]<br />

c) Be<strong>for</strong>e award of the contract, the procuring entity shall ensure that the price of successful<br />

Bid is reasonable and consistent with the required quality.<br />

d) A Bid, <strong>for</strong> respective packages, shall be treated as successful only after the competent<br />

authority has approved the procurement in terms of that Bid.<br />

e) The procuring entity shall award the contract to the bidder whose offer, <strong>for</strong> respective<br />

package(s), has been determined to be the lowest or most advantageous in accordance<br />

with the evaluation criteria set out in the bidding document and if the bidder has been<br />

determined to be qualified to per<strong>for</strong>m the contract satisfactorily on the basis of qualification<br />

criteria fixed <strong>for</strong> the bidders in the bidding document <strong>for</strong> the subject matter of procurement.<br />

f) Prior to the expiration of the period of bid validity, the procuring entity shall in<strong>for</strong>m the<br />

successful bidder, in writing, that its Bid has been accepted.<br />

g) As soon as a Bid is accepted by the competent authority <strong>for</strong> respective packages, its<br />

written intimation shall be sent to the concerned bidder by registered post or email and<br />

asked to execute an agreement in the <strong>for</strong>mat given in the bidding documents on a nonjudicial<br />

stamp of requisite value and deposit the amount of per<strong>for</strong>mance security or a<br />

per<strong>for</strong>mance security declaration, if applicable, within a period specified in the bidding<br />

documents or where the period is not specified in the bidding documents then within fifteen<br />

days from the date on which the letter of acceptance or letter of intent is dispatched to the<br />

bidder.<br />

h) If the issuance of <strong>for</strong>mal letter of acceptance is likely to take time, in the meanwhile a Letter<br />

of Intent (LOI) may be sent to the bidder. The acceptance of an offer is complete as soon<br />

as the letter of acceptance or letter of intent is posted and/ or sent by email (if available) to<br />

the<br />

address of the bidder given in the bidding document. Until a <strong>for</strong>mal contract is<br />

executed, the letter of acceptance or LOI shall constitute a binding contract.<br />

i) The bid security of the bidders who’s Bids could not be accepted shall be refunded soon<br />

after the contract with the successful bidder is signed and its per<strong>for</strong>mance security is<br />

obtained.<br />

23) In<strong>for</strong>mation and publication of award<br />

In<strong>for</strong>mation of award of contract shall be communicated to all participating bidders and<br />

published on the respective website(s) as specified in NIB.<br />

24) Procuring entity’s right to accept or reject any or all Bids<br />

The Procuring entity reserves the right to accept or reject any Bid <strong>for</strong> respective package(s),<br />

and to annul (cancel) the bidding process and reject all Bids or respective packages at any<br />

time prior to award of contract, without thereby incurring any liability to the bidders.<br />

Page 27 of 88

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!