Supply, Installation, Configuration & Integration of IT infrastructure <strong>for</strong> State Data Center, e-Secretariat<br />
& Other Projects [NIB No. F5(776)/DoIT/Tech/13/I/10766/2013 dated 23-08-2013]<br />
ANNEXURE-8: MANUFACTURER’S AUTHORIZATION FORM (MAF){to be filled by the OEMs<br />
<strong>for</strong> all the items marked in Bill of Material on OEMs Letterhead}<br />
(Indicative Format)<br />
To,<br />
{Procuring Entity},<br />
______________________________,<br />
Subject: Issue of the Manufacturer’s Authorisation Form (MAF)<br />
Reference: NIB/ <strong>RFP</strong> Ref. No. _____________________ dated ________<br />
Sir,<br />
We {name and address of the OEM} who are established and reputed original equipment<br />
manufacturers (OEMs) having factories at {addresses of manufacturing location} do hereby<br />
authorize {M/s __________________________} who is our {Distributor/ Channel Partner/<br />
Retailer/ Others }to bid, negotiate and conclude the contract with you against<br />
the a<strong>for</strong>ementioned reference <strong>for</strong> the following Hardware/ Software manufactured by us: -<br />
{OEM will mention the details of all the proposed product(s) with their make/<br />
model.}<br />
We undertake to provide OEM Warranty& Support <strong>for</strong> the offered Hardware/ Software, as<br />
mentioned above, <strong>for</strong> Years.<br />
We hereby confirm that the offered Hardware/ Software is not likely to be declared as End-of-<br />
Sale within next 3 months from the last date of bid submission.<br />
We hereby confirm that the offered Hardware/ Software is not likely to be declared as End-of-<br />
Service/ Support within next 5 years from the last date of bid submission.<br />
Yours faithfully,<br />
For and on behalf of M/s (Name of the manufacturer)<br />
(Authorized Signatory)<br />
Name, Designation & Contact No.:<br />
Address: ___________________________________<br />
Seal:<br />