Supply, Installation, Configuration & Integration of IT infrastructure <strong>for</strong> State Data Center, e-Secretariat<br />
& Other Projects [NIB No. F5(776)/DoIT/Tech/13/I/10766/2013 dated 23-08-2013]<br />
b. Applicable penalty applicable in a quarter is reached equal to the gross amount<br />
payable <strong>for</strong> the quarter or<br />
c. Cumulative applicable penalty is reached equal to 5% of total order value<br />
b) Service Level Changes<br />
i. It is acknowledged that service levels may change as service needs evolves over the<br />
ii.<br />
course of the contract period. The present SLAs have been worked out on the basis of<br />
current expectations. Service levels between the Purchaser and bidder can be revised<br />
after the start of O&M phase in view of experience gained. The experience gained<br />
during this period will be used to fine tune the SLAs, including parameters, targets and<br />
penalties, if required.<br />
Any changes to the levels of services provided during the project period will be<br />
requested, documented and negotiated in good faith by both parties. Either party can<br />
request a change. Changes will be documented as an addendum to the contract.<br />
Page 59 of 88