Supply, Installation, Configuration & Integration of IT infrastructure <strong>for</strong> State Data Center, e-Secretariat<br />

& Other Projects [NIB No. F5(776)/DoIT/Tech/13/I/10766/2013 dated 23-08-2013]<br />

b. Applicable penalty applicable in a quarter is reached equal to the gross amount<br />

payable <strong>for</strong> the quarter or<br />

c. Cumulative applicable penalty is reached equal to 5% of total order value<br />

b) Service Level Changes<br />

i. It is acknowledged that service levels may change as service needs evolves over the<br />

ii.<br />

course of the contract period. The present SLAs have been worked out on the basis of<br />

current expectations. Service levels between the Purchaser and bidder can be revised<br />

after the start of O&M phase in view of experience gained. The experience gained<br />

during this period will be used to fine tune the SLAs, including parameters, targets and<br />

penalties, if required.<br />

Any changes to the levels of services provided during the project period will be<br />

requested, documented and negotiated in good faith by both parties. Either party can<br />

request a change. Changes will be documented as an addendum to the contract.<br />