Panasonic Air Conditioner
Panasonic Air Conditioner
Panasonic Air Conditioner
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CONNECTING THE WIRES TO THE CONTROL BOX Caution Make sure that screws of the terminal are securely tightened.<br />
• Remove a two mounting screw, remove the control box<br />
cover, and then connect the wires by following the procedure<br />
given in the illustration.<br />
10.4.8. Settings<br />
Do not operate the remote controller within 1 minute after turning on the power of the indoor unit.<br />
When using group control with the standard type, at least 1 unit must be set at No.1 at the indoor unit.<br />
Check the settings of the indoor unit in a case where there are no display at remote controller. If there is no problem to the settings, either<br />
group control or standard type should be set at No.16 at the indoor unit before turning the power on again.<br />
• All sets in the group which uses the same remote controller thermistor settings can be controlled by the same remote controller<br />
thermistor.<br />
• Up to a maximum of 16 indoor units can be connected at the time of group control. (Do not connect heat pump unit with cooling<br />
only unit.)<br />
• Indoor unit No. will be set automatically at the time of group control. However, which indoor unit uses which number is unknown.<br />
Indoor unit No. is also possible to be set manually with DIP switches. Since manual address setting has priority to automatic<br />
address setting. To perform automatic address settings after doing manual setting, turn off all DIP switches from No.1 to No.4,<br />
and then stop the operation. Then press three switches such as [AIR SWING AUTO]. [MODE]. [A/C No.] at the same time. (Do<br />
not use manual address setting and automatic address setting together.)<br />
• Centralized control is possible for master unit and slave unit at the time of group control.<br />
39