Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
4TH QUARTER (APRIL – JUNE 20<strong>15</strong>)<br />
CBP<br />
REF<br />
NO.<br />
CBP ACTIONS<br />
PROJECT<br />
DELIVERY<br />
LINKED TO<br />
STRATEGIC<br />
RISK<br />
PROJECT<br />
STATUS<br />
COMMENT<br />
CORRECTIVE<br />
ACTIONS FOR THOSE<br />
PROJECTS UNDER<br />
TARGET<br />
3.1 d<br />
Implement the<br />
Tourism Strategy<br />
and Supporting<br />
Actions 2011 to<br />
2017.<br />
17/18<br />
`Economic<br />
Growth<br />
On Target<br />
Implementation<br />
of the Actions is<br />
on target. Entry<br />
Statement designs<br />
still in progress;<br />
Sign policy review<br />
significant tourism<br />
marketing and<br />
promotional<br />
materials have been<br />
developed and<br />
distributed to Visitor<br />
Centres within the<br />
Perth metropolitan<br />
area. Significant<br />
improvement in<br />
directional signage<br />
to Mindarie Marina<br />
and Barbagallo<br />
raceway have been<br />
installed. The City<br />
also entered the WA<br />
Tourism Awards and<br />
achieved a top 5<br />
placing in the local<br />
government award<br />
category.<br />
This action comes<br />
out as a specific<br />
action in the 20<strong>15</strong>/16<br />
financial year and<br />
is now changed to<br />
reflect its status as<br />
a Council Plan, and<br />
specific projects<br />
against the financial<br />
years to implement<br />
the strategy have been<br />
identified. The first<br />
action is to “Deliver<br />
the 20<strong>15</strong>/16 priorities<br />
for implementing the<br />
Tourism Strategy”.<br />
3.1 e<br />
Implement the<br />
City of Wanneroo<br />
economic<br />
development<br />
strategy.<br />
17/18<br />
Productive<br />
Communities<br />
On Hold<br />
A draft Strategy<br />
has been prepared,<br />
however, this draft<br />
is being reviewed<br />
internally to ensure<br />
consistency and<br />
alignment with the<br />
vision for Economic<br />
Development in the<br />
Strategic Community<br />
Plan.<br />
Start date has been<br />
deferred to 20<strong>15</strong>/16<br />
together with the<br />
revised description of<br />
3.2 a.<br />
3.1 f<br />
Implement the<br />
regional economic<br />
development<br />
framework.<br />
17/18<br />
Productive<br />
Communities<br />
On Hold<br />
The implementation<br />
did not start in<br />
<strong>2014</strong>/<strong>15</strong>. The Draft<br />
Framework has been<br />
prepared<br />
Start date has been<br />
deferred to 20<strong>15</strong>/16.<br />
Scope of planning<br />
work will commence<br />
in 20<strong>15</strong>/16 and the<br />
implementation has<br />
been deferred to<br />
commence in 2016/17.<br />
114 | ANNUAL REPORT <strong>2014</strong>/20<strong>15</strong> | CITY OF WANNEROO | OUR PERFORMANCE