28.08.2018 Views

Annual Report 2014-15

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Financial Statements 20<strong>15</strong><br />

City of Wanneroo<br />

Notes to the Financial Statements<br />

for the year ended 30 June 20<strong>15</strong><br />

Note 34. Fair Value Measurements (continued)<br />

$<br />

(3) Valuation techniques used to derive Level 2 and Level 3 Fair Values (continued)<br />

Plant and Equipment<br />

The City's plant and equipment was valued by Management as at 30 June 2013. Subsequent to the 2013<br />

revaluation the assets are reviewed to ensure that the carry amount does not vary significantly from that<br />

determination using fair value at the reporting date.<br />

Valuations were undertaken utilising in-house professional staff referencing market conditions and the availability of<br />

sales evidence.<br />

Level 2 valuation inputs have been applied having regard to the condition and the useful life of the asset class.<br />

Furniture and Equipment<br />

It was deemed by Management that no material variance exists between the fair value of Furniture and Equipment<br />

using level 3 inputs and the carrying cost of this class. It is considered that the value disclosed is fairly stated.<br />

Infrastructure<br />

All the City's infrastructure has been valued at fair value utilising in-house professional Asset Management staff.<br />

All of the City's infrastructure assets were valued using a depreciated cost valuation technique. This method<br />

used assets current replacement cost less accumulated depreciation calculated on the basis of such cost to<br />

reflect potential of the asset was established then adjusted to take into account the expired service potential of<br />

the asset.<br />

The current replacement cost was measured by referencing the lowest cost at which the asset could be obtained<br />

in the normal course of business.<br />

The total cost values have been calculated using unit cost rate based on current tender and general market rates.<br />

p pp p g<br />

construction cost and current condition and level 3 inputs being residual values and remaining useful life<br />

assessments.<br />

The above techniques and inputs were utilised for all of the following classes:<br />

- Roads<br />

- Drainage<br />

- Pathways<br />

- Car Parks<br />

- Reserves<br />

- Other Infrastructure<br />

page 96<br />

| ANNUAL REPORT <strong>2014</strong>/20<strong>15</strong> | CITY OF WANNEROO | FINANCIAL REPORT<br />

233

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!