17.12.2012 Views

RTHD and RTAC - Trane

RTHD and RTAC - Trane

RTHD and RTAC - Trane

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Starter<br />

Starting Wye Delta With Contactor Integrity Test<br />

Confirm No Transition Complete Signal<br />

(Transition Complete Input Shorted)<br />

Energize Start <strong>and</strong><br />

Stop Relays<br />

Confirm No Compressor Currents<br />

(Starter Fault Type I )<br />

De-Energize Start <strong>and</strong><br />

Stop Relays<br />

Energize <strong>and</strong> Hold<br />

Shorting Relay<br />

Confirm No Compressor Currents<br />

(Starter Fault Type II )<br />

Starting Compressor<br />

Starter Contactor Integrity Test<br />

Arm/Run Comm<strong>and</strong> to Starter Module<br />

Figure 14.Sequence of Operation Y-delta Start<br />

Energize Stop <strong>and</strong> Start<br />

Relays<br />

Starting<br />

Compressor<br />

Starting Compressor<br />

in Wye<br />

Max Accel Timer<br />

(6 to 64 Seconds)<br />

Confirm Proper Compressor Rotation<br />

within 0.3 seconds (Phase Reversal)<br />

<strong>and</strong> > 5% RLA (Phase Loss)<br />

Confirm > 10% RLA Compressor<br />

Currents within 1.6 se conds<br />

(Starter Fault Type III )<br />

When Currents Drop Below 85% RLA +1.5<br />

Seconds, Energize Transition Relay<br />

De-Energize Shorting<br />

Relay<br />

Energize Run<br />

Contactor<br />

Confirm Transition Complete<br />

Input within 2.5 seconds<br />

(Starter Did Not Transition)<br />

De-Energize Transition<br />

Relay<br />

Starting Compressor<br />

Transition Starter to Delta<br />

Compressor<br />

Running<br />

RLC-SVD05A-EN 35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!