31.12.2012 Views

Modular units

Modular units

Modular units

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DE53585<br />

DE53586<br />

Connections Cable-connection from below<br />

for 24 kV<br />

Trenches depth<br />

625<br />

500<br />

375<br />

187.5<br />

Cabling from below (all <strong>units</strong>)<br />

b Through trenches: the trench depth P is given in the table opposite for commonly<br />

used dry single-core cables type (for tri-core cables consult us).<br />

b With stands: to reduce P or eliminate trenches altogether by placing the <strong>units</strong><br />

on 400 mm concrete footings.<br />

b With fl oor void: the trench depth P is given in the table opposite for commonly<br />

used types of cables.<br />

Single-core cables Units until 630 A 1250 A <strong>units</strong><br />

Cable<br />

x-section<br />

(mm 2 )<br />

Bending<br />

radius<br />

(mm)<br />

IM,<br />

SM,<br />

NSM-cables,<br />

NSM-busbars<br />

IMC, DM1-A,<br />

DM1-W,<br />

DM1-S,<br />

DMVL-A,<br />

GAM<br />

86 AMTED398078EN.indd<br />

CRM<br />

CVM<br />

DMV-A,<br />

DMV-S<br />

PM,<br />

QM,<br />

QMC (1)<br />

SM,<br />

GAM<br />

DM1-A (2)<br />

DM1-W (2)<br />

DMV-A (3)<br />

Depth P (mm) all orientations<br />

P1 P2 P2 P2 P3 P4 P5 P6<br />

50 370 140 400 400 500 350<br />

70 400 150 430 430 530 350<br />

95 440 160 470 470 570 350<br />

120 470 200 500 500 600<br />

150 500 220 550 650<br />

185 540 270 670 770<br />

240 590 330 730 830<br />

400 800 1000 1350 1450<br />

630 940 1000 1350 1450<br />

(1) Must be installed with a 100 mm depth metal pan.<br />

(2) Must be installed with a 350 mm depth metal pan, in a fl oor void.<br />

(3) Mounting with a 445 mm depth metal pan compulsory in a fl oor void.<br />

Note: the unit and the cables requiring the greatest depth must be taken into account<br />

when determining the depth P or single-trench installations.<br />

In double-trench installations, depth P must be taken into account for each type of unit<br />

and cable orientations.<br />

Cable trench drawings<br />

1250 A <strong>units</strong> (represented without switchboard side panels) 630 A <strong>units</strong><br />

SM, GAM<br />

For single and tri-core cables<br />

140<br />

50<br />

740<br />

600<br />

P4<br />

DE53587<br />

DMV-A<br />

For single and tri-core cables<br />

140<br />

50<br />

740<br />

600<br />

480<br />

445<br />

P6<br />

DE58350<br />

DM1-A, DM1-W<br />

For single-core cables<br />

140<br />

80<br />

50<br />

740<br />

840<br />

P5<br />

DE53589<br />

DMV-A, DMV-S<br />

For single cables<br />

140<br />

50<br />

740<br />

600<br />

100<br />

P2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!