- Águas do Centro (Contracts for constructing and remodelling the WTP, interceptor systems and the Pumping Station of the<br />

geographic area of Raia, Zêzere and Nabão of the municipalities of Proença-a-Nova, Vila Velha de Ródão, Pedrógão Grande, Figueiró<br />

dos Vinhos, Oleiros and Sertã; Project for designing and constructing of the embankment adjacent to the Bela Vista reservoirs and<br />

the Corgas Water Treatment Plant (WTP) of the municipalities of Castelo Branco and Proença-a-Nova);<br />

- Águas do Centro Alentejo (Contracts for the small WTPs of the Municipalities of Alandroal, Reguengos, Évora, Borba and Redondo);<br />

- Águas do Douro e Paiva (Contracts to interconnect with the subsystem of Vale do Sousa - Ramalde Pumping Station and connection<br />

pipeline at Galegos; Contacts for supplying water to Amarante);<br />

- Águas do Mondego (Contracts associated with construction of the Boavista water supply system; Contract for constructing the<br />

Alge and Louçainha pipeline systems of Alge and Louçainha; Contract for constructing the Ronqueira complex and pipeline system;<br />

Contracts for executing collection and treatment of effluent of the municipality of Penela);<br />

- Águas do Noroeste (Contract for remodelling and renovating the Rabada WTP; Contract for constructing the Ave WTP; Contract<br />

for constructing the Sousa WTP, Contract for constructing the South Jetty Pumping Station and Vila do Conde North interceptor;<br />

Contract for constructing the Ponte da Baia WTP; Contract for constructing the duplication of the Ave interceptor and pumping<br />

stations; Contract for executing the interceptors of Vila do Conde South);<br />

- Águas do Norte Alentejano (Contract for restoring the Alegrete WTP and respective pumping stations and construction of the<br />

WTP and Urra and Caia Pumping Stations; Contract for restoring the Alter do Chão, Chança and Ervedal WTPs);<br />

- Águas do Oeste (Contract for expanding the Nazaré sanitation system and executing the North Shore - Óbidos sanitation system;<br />

Contract for remodelling and expanding the WTPs of Alenquer, Carregado and Nazaré;<br />

- AgdA - Águas Públicas do Alentejo (Contract for constructing the feeder pipe of Sta. Vitória, Mombeja and Beringel; Contract for<br />

constructing the WTP and interceptor systems of Serpa and Vila Nova de S. Bento);<br />

- AdRA - Águas da Região de Aveiro (Contract for constructing the water supply network to Castelões, Presas and Espinheiro;<br />

Contract for expanding the wastewater drainage network of Vila de Vagos - 2nd phase);<br />

-Águas de Santo André; Contract for constructing the dumping cell of Harmless Industrial Waste in the Santo André Landfill);<br />

- Águas de Trás-os-Montes e Alto Douro (Contract for constructing the pipelines, reservoirs and Alto Sabor Pumping Stations);<br />

Contracts for constructing the small WTPs of Douro South; Contract for constructing the Cachão WTP and pumping systems);<br />

- Águas do Zêzere e Côa (Contract for constructing the technical connections of the Pinhel sanitation subs-systems; Contracts for<br />

constructing the sanitation sub-systems of Upper Mondego - municipalities of Seia and Oliveira do Hospital);<br />

- Sanest (Contract for restoring the wastewater treatment facilities of the Estoril Coast Sanitation System; Contract for restoring<br />

the Laje outfall, low zone of the municipality of Oeiras);<br />

- Simarsul (Contract for designing and constructing the WTP and the drainage and pumping systems of the Barreiro - Moita subsystem;<br />

Contract for designing and constructing the Quinta do Conde WTP; Contract for constructing the underwater outfall of<br />

the Lagoa - Meco WTP);<br />

- Simria (Contract for constructing the Laje and Caster interceptors; Contracts for stabilizing underwater crossings - Main Canal and<br />

São Jacinto Canal);<br />

- Simtejo (Contract for designing and constructing the adaptation and complementary work of Alcântara WTP; Contract for<br />

constructing the Agencies pumping system and the underwater outflow Contract for the interceptor and Pumping Stations of<br />

Largo Chafariz de Dentro - Cais do Sodré).<br />

In addition, affiliate AdRA - Águas da Região de Aveiro recorded an addition of intangible assets - Infrastructure Usage Rights, in the<br />

amount of 98,118,261 euros. This value corresponds to monetary compensation in the form of remuneration for allocation of the<br />

infrastructures where the company operates.<br />

Investment in the UNR conducted in <strong>2010</strong> was approximately 101,724 000 euros. The following table lists the main investments<br />

according to type and system.<br />

Landfill Biogas Organic Waste Selective<br />

Sanitário Landfill Recovery Plants Incinerator Transfer Collection Sorting Other Total<br />

Resinorte, S.A. 818,838 7,396 1,389,890 - 4,183,292 797,366 - 496,740 7,693,523<br />

Suldouro, S.A. 168,064 976,456 15,941,695 - - 241,307 315,524 2,118 17,645,164<br />

Ersuc, S.A. 183,460 681,610 23,322,697 - 15,000 859,082 2,663,801 212,467 27,938,116<br />

Valorlis, S.A. 809,424 709,440 3,062,596 - 300 142,376 14,330 386,696 5,125,162<br />

Amarsul, S.A. 952,544 1,678,600 4,500,730 - 208,827 532,199 1,288,186 306,917 9,468,003<br />

Valnor, S.A. 1,811,198 - 2,156,541 - - 494,368 196,528 619,124 5,277,758<br />

Algar, S.A. 2,266,883 1,847,052 8,277,120 - 365,380 928,946 631,953 1,260,559 15,577,893<br />

Valorsul, S.A. 2,650,905 1,727,443 - 802,773 1,030,264 - 415,284 3,234,012 9,860,682<br />

Total 9,661,317 7,627,997 58,651,269 802,773 5,803,064 3,995,643 5,525,605 6,518,633 98,586,302<br />