10.02.2013 Views

Annual Report 2010 - AdP

Annual Report 2010 - AdP

Annual Report 2010 - AdP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Geographic Concession Area<br />

System Area (km 2 ) %<br />

Valorminho 951 2%<br />

Resulima 1,743 4%<br />

Resinorte 8,031 17%<br />

Resiestrela 6,133 13%<br />

Suldouro 384 1%<br />

Ersuc 6,694 14%<br />

Valorlis 2,160 4%<br />

Valorsul 3,378 7%<br />

Amarsul 1,559 3%<br />

Valnor 11,981 25%<br />

Algar 4,996 10%<br />

Total EGF 48,009 100%<br />

Others<br />

48%<br />

Resulima<br />

4%<br />

Valorminho<br />

2%<br />

Resinorte<br />

17%<br />

The following represent the main key events taking place at the Waste BU in <strong>2010</strong>:<br />

Resiestrela<br />

13%<br />

Suldouro<br />

1%<br />

Ersuc<br />

14%<br />

Valorlis<br />

4%<br />

Valorsul<br />

7%<br />

Amarsul<br />

3%<br />

• The founding of, following the merger of the Valorsul and Resioeste companies, the new Valorsul— Valorização e Tratamento de<br />

Resíduos Sólidos das Regiões de Lisboa e do Oeste, S.A., and the respective multi-municipal system under the auspices of Decree<br />

Law No. 68/<strong>2010</strong> of 15 June, and for a period of 25 year;<br />

• Expansion of Valnor to the municipalities making up Raia Pinhal (Beira Interior), through Dispatch 16510/<strong>2010</strong>, of 29 October, duly<br />

recognising the public interest in this merger and the increase in the company capital through the incorporation of reserves and<br />

carried over results as well as the issuing of new shares in order to restructure permanent capital within a period of high investment<br />

levels in accordance with the respective signing of the Addendum to the Concessionary Contract, on 27 December <strong>2010</strong>;<br />

• Authorisation by the sector regulatory entities and the Ministry of Finance for expanding the Ersuc concessionary period through<br />

to 2030 and for the correction adjustments to company capital through the incorporation of reserves and carried over results as<br />

well as the issuing of new shares in order to restructure permanent capital within a period of high investment levels in accordance<br />

with the respective signing of the Addendum to the Concessionary Contract, on 29 December <strong>2010</strong>;<br />

• Supervision of the sub-contracting work on the construction of the Mechanical Biological Treatment Plants and Organic Recovery<br />

Plants making recourse to a new generation in anaerobic digestion technologies, taking place at Valnor, with the tendering of the<br />

expansion of the site (at the civil construction phase, specifically land moving, foundations and structures); at Valorlis (undergoing<br />

an experimental service phase, running tests and operational procedures with wastes); at Algar (in the final phase of civil<br />

construction); at Amarsul (at the stage of civil construction with project negotiations and equipment approval processes ongoing);<br />

in Suldouro (in an experimental service phase, running tests and operational procedures with different waste types); and at Ersuc,<br />

in Aveiro and Coimbra (at the stage of civil construction with project negotiations and equipment approval processes ongoing);<br />

• Supervising, within the scope of landfill biogas energy recovery projects, the subcontracted construction and installation of energy<br />

recovery units at the following companies: Valorminho, Resulima, Suldouro, Ersuc, Resiestrela, Valorsul, Valnor, Amarsul and Algar.<br />

With the operational start-up of these new installations, installed EGF Group landfill biogas capacity will rise to 21.8 MW.<br />

• Within the framework of the decontamination of the soils of the former national steel foundry and a chemicals plant, applications<br />

were submitted and approved by the POVT for the implementation of phase two - Removal, transport and deposit in a<br />

contaminated soil landfill, with this work due to begin in the first quarter of 2011;<br />

• Accompanying the contracting of EIB - European Investment Bank financing for ongoing investments at Amarsul, Algar, Suldouro,<br />

Valorlis, Valnor and Ersuc, with a total contractual sum of € 145 million;<br />

• Design and development of a set of incentive initiatives combating the production of waste with the objective of contributing<br />

towards achieving the national target of cutting the production of urban waste by 10% through to 2016, and under the auspices<br />

of the Cooperation Protocol signed in November 2009 with the Portuguese Environment Agency. Of the diverse range of actions<br />

taking place, one highlight was the Fraldinhas (Diapers) Project, staged during Waste Prevention Week between 20 and 28<br />

November. The project consisted of distributing reusable diaper kits to recently born babies at 24 state hospitals within the scope<br />

of the multi-municipal network and extending from the north to the south of the country and reaching out to 1,800 babies.<br />

• EGF is represented on the Executive Committee of the Commission for Climate Change with the nomination of two members<br />

of staff for its respective Technical Secretariat. The Commission’s mission is the technical management of the Portuguese Carbon<br />

Fund and ensuring the monitoring of the National Climate Change Plan.<br />

Algar<br />

10%<br />

EGF<br />

52%<br />

Valnor<br />

25%<br />

<strong>AdP</strong> Group_<strong>Annual</strong> <strong>Report</strong> <strong>2010</strong>_98|99

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!