31 April 25, 2011<br />

06863<br />

utilities; revise steel reinforcing beneath dry food storage ; re-route electric, telephone and CATV<br />

conduit to new utility pole as required by local utility<br />

13. Approval <strong>of</strong> a Proposed Change Order (No. Five) to the Contract for the Lafayette High School<br />

Stadium Replacement Project BG 09-087<br />

Mary Wright:<br />

Correct deficient plans and specs: install conduit, wiring, boxes and connections for urinal<br />

automatic flush mechanisms; install additional underground feeders to the baseball field<br />

concession stand and dugouts<br />

Improve original plans and specs: replace plumbing drain fittings<br />

Building code compliance: install additional exit signs, conduit and wiring required for<br />

bathroom facilities<br />

14. Approval <strong>of</strong> a Proposed Change Order (No. Eight) to the Contract for the Construction <strong>of</strong> the<br />

Locust Trace Agriscience Farm (Phase 2) BG 09-339<br />

Mary Wright:<br />

Improve original plans and specs: mechanical/electrical/plumbing revisions to Vet Clinic;<br />

transfer labor costs from DPO (Accent Draperies) to the General Contractor contract<br />

Correct deficient plans and specs: add electric to one animal watering station and heaters for<br />

all four stations<br />

Resolve unforeseen conflicts: reduce the quantity and sizes for the Variable Air Volume Boxes<br />

15. Approval <strong>of</strong> a Proposed Change Order (No. Eleven) to the Contract for the Renovation at Cassidy<br />

Elementary School BG 08-206<br />

Mary Wright:<br />

Improve original plans and specs: repair and replace cork material and decorative wood trim<br />

on 2 built-in tack boards in hallway<br />

Resolve unforeseen conflicts: install continuous hinge on door 13E<br />

16. Approval <strong>of</strong> a Reduction in Retainage on the Construction Contract for the Renovation at Cassidy<br />

Elementary School BTG 08-206<br />

Mary Wright:<br />

Project approaching completion<br />

17. Approval <strong>of</strong> a Reduction in Retainage on the Construction Contract for the Renovation at Yates<br />

Elementary School BG 10-025<br />

Mary Wright:<br />

Project approaching completion<br />

K. Approval <strong>of</strong> Action Items<br />

18. Approval <strong>of</strong> Third-Party Special Inspection Agreement for the Renovation <strong>of</strong> Clays Mill<br />

Elementary School BG 10-010<br />

Mary Wright:<br />

Required by KDE