K.17 APPROVAL OF A BG-1 PROJECT APPLICATION<br />
FOR THE RENOVATION<br />
OF JAMES LANE ALLEN ELEMENTARY SCHOOL<br />
BACKGROUND AND RATIONALE: The renovation <strong>of</strong> the existing James Lane Allen Elementary School<br />
is listed as priority 2c.1 on FCPS’s 2009 District Facility Plan. The Director <strong>of</strong> Facility Design and<br />
Construction has drafted a preliminary cost estimate for the renovation <strong>of</strong> the existing building and the<br />
construction <strong>of</strong> a small addition, yielding a final project <strong>of</strong> approximately 69,236 SF to serve 600 students.<br />
The program is consistent with other recent FCPS elementary school projects. Project cost estimates are<br />
based on the most recent construction bids and include: design and financing fees; furnishings; surveys;<br />
and other miscellaneous costs. The project design must begin now in order to meet an expected<br />
completion date <strong>of</strong> late 2013. The <strong>Board</strong> approved Moody- Nolan Architects as the design consultant for<br />
this project at its February 28, 2011 meeting.<br />
PROPOSAL: Based on the rationale above, a BG-1 Project Application is required as follows:<br />
Initial BG-1 Project Application Budget<br />
Total Construction Cost: $11,077,760<br />
Architect/Engineer Fee: $675,585<br />
Bond Discount: $229,622<br />
Fiscal Agent Fee: $93,333<br />
Contingencies: $553,888<br />
Site Acquisition: -<br />
Furnishings/Equipment: $630,000<br />
Furnishings/Computers: $208,000<br />
HVAC Balancing & Asbestos Abatement $69,000<br />
Technology Network Systems (KETS), telephone, etc.: $35,000<br />
Surveys, Printing, etc.: $50,000<br />
Special Inspections: $45,000<br />
Pr<strong>of</strong>essional Services: $20,000<br />
Total Estimated Cost: $13,687,188<br />
FUNDING SOURCE:<br />
Fund Org. Code Object Code Balance<br />
Capital Outlay 0003112<br />
0450<br />
$687,707<br />
0003113<br />
0910<br />
$312,293<br />
Local Bond 360 5110 $12,687,188<br />
STAFF CONTACT: William R. Wallace, AIA, Director, Facility Design & Construction @ 381.3824<br />
REFERENCE: 702 KAR 4:160<br />
RECOMMENDATION: A motion is in order to:<br />
“approve a BG-1 Project Application for the renovation and addition at James Lane Allen Elementary<br />
School in the amount <strong>of</strong> $13,687,188 (Thirteen Million, Six Hundred Eighty-seven Thousand, One<br />
Hundred Eighty-eight Dollars), subject to the approval <strong>of</strong> the Kentucky Department <strong>of</strong> <strong>Education</strong>, District<br />
Facilities Branch, per the provisions <strong>of</strong> 702 KAR 4:160.”<br />
On a motion by ______________________, and seconded by ____________________, the <strong>Board</strong><br />
approves a BG-1 Project Application for the renovation and addition at James Lane Allen Elementary<br />
School in the amount <strong>of</strong> $13,687,188 (Thirteen Million, Six Hundred Eighty-seven Thousand, One<br />
Hundred Eighty-eight Dollars), subject to the approval <strong>of</strong> the Kentucky Department <strong>of</strong> <strong>Education</strong>, District<br />
Facilities Branch, per the provisions <strong>of</strong> 702 KAR 4:160.<br />
______________________________________ _____________________________________<br />
John Price, Chair Stuart M. Silberman, Superintendent<br />
93 April 25, 2011