J.15 APPROVAL OF A PROPOSED CHANGE ORDER (NO. TWELVE)<br />
TO THE CONTRACT FOR THE RENOVATION AT<br />
CASSIDY ELEMENTARY SCHOOL<br />
BG 08-206<br />
BACKGROUND AND RATIONALE: The renovation <strong>of</strong> the existing Cassidy Elementary School is listed<br />
as priority 1c.2 on FCPS’s 2004 District Facility Plan. A team lead by Tate Hill Jacobs Architects designed<br />
a facility <strong>of</strong> approximately 73,500 SF based upon FCPS elementary school program standards. Bids were<br />
received on February 3, 2009 and construction began March 6, 2009. A contract with D.W. Wilburn, Inc.<br />
in the amount <strong>of</strong> $9,061,000.00 was accepted and approved by the <strong>Board</strong> in a meeting held on February<br />
23, 2009. The Department <strong>of</strong> Physical Support Services, the design consultants and the local building<br />
code <strong>of</strong>ficials have reviewed the progress <strong>of</strong> the work. Changes to the original plans and specifications<br />
have been necessary in order to satisfy the requirements described below. Approval <strong>of</strong> these changes<br />
allows the work to be completed.<br />
COST: The description and cost <strong>of</strong> these items are summarized as follows:<br />
To resolve unforeseen conflict:<br />
Provide labor, materials and equipment to prep floor at wall<br />
perimeter in Phases 2 and 3 areas due to existing<br />
concealed plaster trim at wall base; add:<br />
Change to<br />
DPOs<br />
Change to<br />
GC Contract<br />
$5,836.25<br />
89 April 25, 2011<br />
5.3% A/E<br />
FEE<br />
$309.32<br />
Total Change Order No. Twelve: $5,836.25<br />
Design consultant fees: $309.32<br />
Total Cost: $6,145.57<br />
A 5% contingency ($450,180.00) is included in the project's available funds. There have been eleven<br />
previous change orders on this project. The cost <strong>of</strong> the current and all changes orders represents a<br />
0.99% increase in the construction cost.<br />
FUNDING SOURCE & BALANCE:<br />
Fund Organization Code Project Code Object Code Balance<br />
Construction 360 0323603 08206 0840 $290,935.01<br />
STAFF CONTACT: William R. Wallace, AIA, Director, Facility Design & Construction @ 381.3824<br />
REFERENCE: 702 KAR 4:160<br />
RECOMMENDATION: A motion is in order to:<br />
“approve the proposed additive Change Order No. Twelve to the contract with D.W. Wilburn, Inc., for the<br />
renovation at Cassidy Elementary School in the amount <strong>of</strong> $5,836.25 (Five Thousand, Eight Hundred<br />
Thirty-six Dollars and Twenty-five Cents), with an equivalent transfer <strong>of</strong> funds from Object Code 0840 to<br />
0450, and a corresponding transfer <strong>of</strong> $309.32 (Three Hundred Nine Dollars and Thirty-two Cents) for<br />
design consultant fees from Object Code 0840 to 0346, subject to the approval <strong>of</strong> the Kentucky<br />
Department <strong>of</strong> <strong>Education</strong>, District Facilities Branch, per the provisions <strong>of</strong> 702 KAR 4:160.”<br />
On motion by __________________________, seconded by ___________________________________,<br />
the <strong>Board</strong> approved the proposed additive Change Order No. Twelve to the contract with D.W. Wilburn,<br />
Inc., for the renovation at Cassidy Elementary School in the amount <strong>of</strong> $5,836.25 (Five Thousand, Eight<br />
Hundred Thirty-six Dollars and Twenty-five Cents), with an equivalent transfer <strong>of</strong> funds from Object Code