Breaker Interface Module II - Eaton Canada
Breaker Interface Module II - Eaton Canada
Breaker Interface Module II - Eaton Canada
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Page 16<br />
➂<br />
MAIN MENU ➀ ➄ 13<br />
METER HARMONICS VIEW SETTINGS PROGRAM SETTINGS<br />
➁ ➁<br />
➁ ➃ ➁ 24 11<br />
Phase A Current<br />
Phase A<br />
Phase B Current<br />
THD Magnitude<br />
➅<br />
Configuration<br />
Phase C Current<br />
Phase B<br />
THD Magnitude<br />
Protection<br />
➅<br />
Ground Current<br />
Neutral Current<br />
Min Max Current<br />
Power<br />
Peak Demand<br />
Total Energy<br />
Forward Energy<br />
Reverse Energy<br />
System Power Factor<br />
4 17<br />
Voltage A-B<br />
Voltage B-C<br />
Voltage C-A<br />
Voltage A-N<br />
Voltage B-N<br />
Voltage C-N<br />
➆ ➉<br />
➅<br />
Min A<br />
Current<br />
Max A<br />
Current<br />
Min B<br />
Current<br />
Max B<br />
Current<br />
Min C<br />
Current<br />
Max C<br />
Current<br />
Min<br />
Ground<br />
Current<br />
Max<br />
Ground<br />
Current<br />
Min<br />
Neutral<br />
Current<br />
Max<br />
Neutral<br />
Current<br />
Reset<br />
Phase C<br />
THD Magnitude<br />
Phase A<br />
(%) Harmonic Content<br />
Phase B<br />
(%) Harmonic Content<br />
Phase C<br />
(%) Harmonic Content<br />
➂<br />
Ground<br />
THD Magnitude<br />
Ground<br />
(%) Harmonic Content<br />
Neutral<br />
(%) Harmonic Content<br />
18<br />
Neutral<br />
THD Magnitude<br />
4<br />
19<br />
➅<br />
➅<br />
➅<br />
➅<br />
➅<br />
Fundamental<br />
thru 27 Harmonics<br />
Fundamental<br />
thru 27 Harmonics<br />
Fundamental<br />
thru 27 Harmonics<br />
Fundamental<br />
thru 27 Harmonics<br />
Fundamental<br />
thru 27 Harmonics<br />
Figure 4-1 <strong>Breaker</strong> <strong>Interface</strong> <strong>Module</strong> Menu Diagram — (continued to next page)<br />
➉<br />
Firmware Versions & Revisions<br />
Number of Poles<br />
Phase A Indicator<br />
Frequency<br />
Sentinel CT Ratio<br />
Sentinel VAR Sign Convention<br />
Sentinel Wiring Scheme<br />
Waveform Acquisition Interval<br />
Sliding Window Assignment<br />
➆/➇ ➉ 20<br />
Pulse Initiation<br />
➂<br />
Device Alarms<br />
BIM Alarm<br />
No Response Enable<br />
Memory Error Enable<br />
Bad Frame Enable<br />
<strong>Breaker</strong> Trip Enable<br />
Long Delay Enable<br />
Ground Overcurrent Enable<br />
Neutral Overcurrent Enable<br />
High Load Enable<br />
Operations Enable<br />
kVA Demand Enable<br />
kW Demand Enable<br />
Demand Peak Exceeded Setting<br />
WH Pulse Initiator Setting<br />
Power Factor Enable<br />
THD Enable<br />
Undervoltage Enable<br />
Overvoltage Enable<br />
Underfrequency Enable<br />
Overfrequency Enable<br />
Reverse Phase Sequence Enable<br />
➆/➇ ➉ 20<br />
➅<br />
➅<br />
➈<br />
➈<br />
Ground Setting<br />
Neutral Setting<br />
High Load Setting<br />
High Load Time<br />
Operations Setting<br />
kVA Demand Setting<br />
kW Demand Setting<br />
Power Factor Setting<br />
THD Setpoints<br />
Log Enable<br />
Undervoltage Setting<br />
Undervoltage Time<br />
Overvoltage Setting<br />
Overvoltage Time<br />
Underfrequency Pickup<br />
Underfrequency Time<br />
Overfrequency Pickup<br />
Overfrequency Time<br />
Reverse Phase Sequence<br />
➆/➇ ➉ 20<br />
I.B. 29C893B<br />
Frame Size<br />
Rating Plug<br />
Long Delay Action<br />
Long Delay Slope<br />
Long Delay Setting<br />
Long Delay Time<br />
Powered Thermal Memory<br />
Unpowered Thermal Memory<br />
Short Delay Action<br />
Short Delay Slope<br />
Short Delay Setting<br />
Short Delay Time<br />
Instantaneous Action<br />
Instantaneous Setting<br />
Discriminator<br />
Ground Fault Action<br />
Ground Fault Slope<br />
Ground Fault Setting<br />
Ground Fault Time<br />
Ground Current Sense<br />
Ground Scale Factor<br />
<strong>Breaker</strong> Neutral Ratio<br />
Amp Out Of Balance Trip<br />
Amp Out Of Balance Time<br />
Phase Loss Trip Time<br />
Undervoltage Trip Setting<br />
Undervoltage Trip Time<br />
Underfrequency Trip Pickup<br />
Underfrequency Trip Time<br />
Overfrequency Trip Pickup<br />
Overfrequency Trip Time<br />
Reverse Power Trip Action<br />
Reverse Power Trip Time<br />
➆/➇ ➉ 20<br />
Effective 2/01<br />
28<br />
28<br />
28<br />
28<br />
21