Proposed Wind and Solar (Photovoltaic) Energy Facilities on Kangnas Farm near Springbok in the Northern Cape: Draft EIR 88<br />

the population is semi- and unskilled. This will not change or improve unless education levels<br />

are improved. The more skilled people become the more income they will earn.<br />

The employment profile of the study area is an important indicator of human development, but<br />

also of the level of disposable income and therefore the expenditure capacity of the residing<br />

population. Nama Khoi LM is largely populated by potentially economically active and young<br />

people. During 2009 38.6 % were employed. This implies that there is a large amount of human<br />

capital available for any kind of work, but also that there is space for training and developing<br />

young and economically active people in highly qualified occupations in the relevant fields<br />

needed. Furthermore development projects need to take into consideration the mode of<br />

transport utilized by the labour force. New industrial developments should not be situated far<br />

away from the pick-up or drop-off points of various means of transportation. The level of<br />

employment and the type of occupations taken up by the population of the LM directly affects<br />

the income levels of its people. 57.7% of households fall within the poverty level. The high<br />

poverty level has social consequences.<br />

b) Impact assessment<br />

Note that construction phase impacts on the local and regional economy are assessed under<br />

Section 4.3.<br />

The main economic effects that were measured were employment numbers, Gross Geographic<br />

Product (GGP) and new business sales in order to determine the impact of the proposed<br />

projects on the local residents. These impacts were quantified in terms of direct, indirect and<br />

induced impacts. Descriptions of these measures are as follows:<br />

• Impact on employment numbers: The number of additional jobs created or jobs lost as a<br />

result of the change in the economic growth of the local economy. This is the most<br />

popular measure of economic impact because it is easier to comprehend than large,<br />

abstract Rand figures.<br />

• GGP: This measures the broader impact of the full income effect and essentially reflects<br />

the sum of wage income and corporate profit generated in the region.<br />

• New Business Sales: This measures the impact on Business Output (also referred to as<br />

revenue or sales volume) and is the broadest measure of economic activity as it<br />

generates the largest numbers. It includes the gross level of business revenue, which<br />

pays for cost of materials and cost of labour, as well as generating net business income<br />

profits.<br />

o Additional New Business Sales:<br />

The cost implications for the proposed projects for the annual operations are less than that of<br />

the construction phase and as a result the impacts on new business sales will be less than the<br />

impacts analysed in the construction phase. However the impacts from the construction phase<br />

are a once off and the impacts during the operational phase would accrue each year during<br />

operation therefore the total impacts from the operational phase would in time surpass those of<br />

the construction phase, provided the projects operate for a number of years. The total impact<br />

that the proposed wind farm should have on new business sales during the operational phase is<br />

R185 500 000 (summation of direct, indirect and induced impacts). These new business sales<br />

should accrue to businesses that are directly involved in the maintenance, security and other<br />

© <strong>Aurecon</strong> (2012) No unauthorised reproduction, copy<br />

or adaptation, in whole or in part, may be made.<br />