04.05.2013 Views

Final EIAR - Aurecon AME Environmental | Environmental Projects

Final EIAR - Aurecon AME Environmental | Environmental Projects

Final EIAR - Aurecon AME Environmental | Environmental Projects

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Proposed Wind and Solar (Photovoltaic) Energy Facilities on Kangnas Farm near Springbok in the Northern Cape: <strong>Final</strong> EIR 13<br />

• Site notices, in English and Afrikaans, were erected at the entrances to the farms and at<br />

the Springbok Public Library on 28 May 2012 (the site notices are included in the Scoping<br />

Report).<br />

1.4.2 The Scoping Phase<br />

Scoping is defined as a procedure for determining the extent of, and approach to, the EIA<br />

Report phase and involves the following key tasks:<br />

• Involvement of relevant authorities and I&APs;<br />

• Identification and selection of feasible alternatives to be taken through to the EIA Phase;<br />

• Identification of significant issues/impacts associated with each alternative to be<br />

examined in the EIA Report; and<br />

• Determination of specific Terms of Reference (ToR) for any specialist studies required in<br />

the EIA Report (Plan of Study for the EIA Report).<br />

The Scoping Phase involved a desktop review of relevant literature, including a review of<br />

previous environmental studies in the area. These included, inter alia, the following:<br />

• Namakwa District Municipality (DM) Integrated <strong>Environmental</strong> Management Program<br />

(IEMP)(African EPA, 2007);<br />

• Namakwa DM Spatial Development Framework (SDF) (2007);<br />

• Nama Khoi Local Municipality LM SDF (Macroplan, 2007);<br />

• Vegetation Map of South Africa (Mucina and Rutherford, 2006); and<br />

• Groundwater Resources in the Northern Cape Province (DWA, 2008).<br />

An inception field trip of the site was undertaken on 25 November 2011 to inform a Fatal Flaw<br />

Analysis (FFA) for Mainstream. The main purpose was to familiarize the consultants with the<br />

site and to allow for a rapid survey of the site to identify potential areas of concern. Valuable<br />

information was also obtained from landowners, who have intimate knowledge of the farms and<br />

general area.<br />

The information gathered during the site visit and subsequent report was used in refining the<br />

Plan of Study for the EIA process and ToR for the specialist studies which were undertaken<br />

during the EIA Phase.<br />

1.4.3 The EIA Phase<br />

The Scoping Phase is followed by the EIA Phase, during which the specialist investigations<br />

occur, and culminates in a comprehensive EIR documenting the outcome of the impact<br />

assessments.<br />

This report covers the third and final phase of the EIA process, namely the EIA Phase. The<br />

purpose of the EIR is to describe and assess the range of feasible alternatives identified during<br />

the Scoping process in terms of the potential environmental impacts identified. The ultimate<br />

purpose is to provide a basis for informed decision making, firstly by the applicant with respect<br />

to the option(s) they wish to pursue, and secondly by the environmental authority regarding the<br />

environmental acceptability of the applicant’s preferred option.<br />

© <strong>Aurecon</strong> (2012) No unauthorised reproduction, copy<br />

or adaptation, in whole or in part, may be made.<br />

P:\<strong>Projects</strong>\108495 Kangnas WEF & PV EIA's\3 Project Delivery\4 Reports\FEIR\FEIR 210213 <strong>Final</strong>.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!