Final EIAR - Aurecon AME Environmental | Environmental Projects
Final EIAR - Aurecon AME Environmental | Environmental Projects
Final EIAR - Aurecon AME Environmental | Environmental Projects
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Proposed Wind and Solar (Photovoltaic) Energy Facilities on Kangnas Farm near Springbok in the Northern Cape: Draft EIR 91<br />
Table 4.3: Impact on employment during operational phase, for a 250 MW solar and a 750<br />
MW wind energy facility<br />
Sector Impacted Direct Impact Indirect Impact Induced Impact Total Impact<br />
Agriculture 0 3 7 10<br />
Mining 0 4 0 4<br />
Manufacturing 0 6 4 10<br />
Utilities 69 1 0 70<br />
Construction 0 22 0 22<br />
Trade and<br />
accommodation<br />
0 39 10 49<br />
Transport 0 5 3 7<br />
Financing 0 6 2 9<br />
Business services 0 13 1 14<br />
Services 0 9 21 30<br />
Total 69 108<br />
Photovoltaic Plant<br />
49 226<br />
Agriculture 0 1 8 9<br />
Mining 0 0 0 0<br />
Manufacturing 0 2 5 8<br />
Utilities 130 0 0 130<br />
Construction 0 0 0 1<br />
Trade and<br />
accommodation<br />
0 91 12 103<br />
Transport 0 5 3 9<br />
Financing 0 14 3 16<br />
Business services 0 2 1 4<br />
Services 0 9 20 29<br />
Total 130 126<br />
No-Go Alternative<br />
53 309<br />
Agriculture 0 0 0 0<br />
Mining 0 0 0 0<br />
Manufacturing 0 0 0 0<br />
Utilities 0 0 0 0<br />
Construction 0 0 0 0<br />
Trade and<br />
accommodation<br />
0 0 0 0<br />
Transport 0 0 0 0<br />
Financing 0 0 0 0<br />
Business services 0 0 0 0<br />
Services 0 0 0 0<br />
Total 0 0 0 0<br />
o Impact on tourism industry<br />
The operational phase of the proposed wind and solar energy facilities should have a neutral<br />
impact on the tourism industry. Although the operations and presence of a wind and solar<br />
energy facilities could serve as tourist attraction and increase the diversity of tourism operations<br />
in the region (to include green tourism) it would not necessarily contribute to an increase in<br />
tourist. It is not anticipated that the proposed facilities would have any impact on the numbers of<br />
tourists at the Goegap Nature Reserve.<br />
The potential impact from both the proposed wind and solar energy facility on new business<br />
sales, GDP and employment would be of regional extent, very low to low magnitude and<br />
© <strong>Aurecon</strong> (2012) No unauthorised reproduction, copy<br />
or adaptation, in whole or in part, may be made.<br />
P:\<strong>Projects</strong>\108495 Kangnas WEF & PV EIA's\3 Project Delivery\4 Reports\FEIR\FEIR 210213 <strong>Final</strong>.doc