Proposed Wind and Solar (Photovoltaic) Energy Facilities on Kangnas Farm near Springbok in the Northern Cape: Draft EIR 89<br />

operational activities required for the proposed facilities. The total impact for the proposed solar<br />

energy facility during the operational phase is R158 260 000 (Table 4.1).<br />

Table 4.1: New business sales during operational phase, for a 250 MW solar and a 750<br />

MW wind energy facility<br />

Sector Impacted Direct Impact Indirect Impact Induced Impact Total Impact<br />

Agriculture R0 R460, 000 R930, 000 R1, 390, 000<br />

Mining R0 R2, 630, 000 R120, 000 R2, 740, 000<br />

Manufacturing R0 R2, 270, 000 R2, 210, 000 R4, 480, 000<br />

Utilities<br />

R124, 920, 000<br />

R1, 360, 000 R420, 000 R126, 710, 000<br />

Construction R0 R5, 570, 000 R50, 000 R5, 620, 000<br />

Trade and<br />

accommodation<br />

R0 R10, 340, 000 R2, 550, 000 R12, 890, 000<br />

Transport R0 R4, 950, 000 R3, 900, 000 R8, 860, 000<br />

Financing R0 R7, 370, 000 R4, 160, 000 R11, 530, 000<br />

Business services R0 R3. 720, 000 R330, 000 R4, 050, 000<br />

Services R0 R2, 320, 000 R5, 200, 000 R7, 520, 000<br />

Total R124, 920, 000 R41, 010, 000<br />

Photovoltaic Plant<br />

R19, 860, 000 R185, 800, 000<br />

Agriculture R0 R140, 000 R1, 080, 000 R1, 210, 000<br />

Mining R0 R100, 000 R130, 000 R230, 000<br />

Manufacturing R0 R1, 090, 000 R2, 610, 000 R3, 690, 000<br />

Utilities R86, 000, 000 R180, 000 R480, 000 R86, 660, 000<br />

Construction R0 R120, 000 R60, 000 R180, 000<br />

Trade and<br />

accommodation<br />

R0 R23, 530, 000 R2, 960, 000 R26, 500, 000<br />

Transport R0 R5, 730, 000 R4, 520, 000 R10, 260, 000<br />

Financing R0 R15, 430, 000 R4, 630, 000 R20, 060, 000<br />

Business services R0 R680, 000 R380, 000 R1, 060, 000<br />

Services R0 R2, 650, 000 R5, 770, 000 R8.41<br />

Total R86, 000, 000 R49, 650, 000<br />

No-Go Alternative<br />

R22, 610, 000 R158, 260, 000<br />

Agriculture R0 R0 R0 R0<br />

Mining R0 R0 R0 R0<br />

Manufacturing R0 R0 R0 R0<br />

Utilities R0 R0 R0 R0<br />

Construction R0 R0 R0 R0<br />

Trade and<br />

accommodation<br />

R0 R0 R0 R0<br />

Transport R0 R0 R0 R0<br />

Financing R0 R0 R0 R0<br />

Business services R0 R0 R0 R0<br />

Services R0 R0 R0 R0<br />

Total R0 R0 R0 R0<br />

o Additional Gross Domestic Product (GDP):<br />

The total impact that the proposed wind farm would have on additional GDP during the<br />

operational phase is R39 730 000, while the total impacts of the proposed solar energy facility<br />

should amount to R45 470 000 during the operations of the proposed development (Table 4.2).<br />

The direct stimulation for the increase in production is the increase in new business sales. Thus<br />

these two economic indicators are mutually related.<br />

© <strong>Aurecon</strong> (2012) No unauthorised reproduction, copy<br />

or adaptation, in whole or in part, may be made.<br />

P:\<strong>Projects</strong>\108495 Kangnas WEF & PV EIA's\3 Project Delivery\4 Reports\FEIR\FEIR 210213 <strong>Final</strong>.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!