Proposed Wind and Solar (Photovoltaic) Energy Facilities on Kangnas Farm near Springbok in the Northern Cape: <strong>Final</strong> EIR 138<br />

5 CONCLUSIONS AND WAY FORWARD<br />

The purpose of this Chapter is to briefly summarise and conclude the EIR and describe the way<br />

forward.<br />

5.1 CONCLUSIONS<br />

As per the requirements of NEMA, this EIR investigation has reviewed a range of project<br />

alternatives and contemplated the array of potential environmental impacts associated with the<br />

following proposed activities in Springbok:<br />

Proposed wind energy facility:<br />

• Construction of 180 four phases of 140 MW capacity with wind turbines ranging in size<br />

wind turbines of from1.5-4 MW capacity;<br />

• Associated infrastructure including:<br />

o Hard standings of 20 40 m x 40 m alongside turbines;<br />

o Access roads of 4 – 10 m wide between turbines;<br />

o Overhead or underground transmission lines connecting turbines;<br />

o One main substation connecting the proposed energy facilities to the Eskom line;<br />

and<br />

o Two satellite substations that would link sectors of the facility to a main<br />

substation with overhead lines.<br />

Proposed solar energy facility:<br />

• Construction of 225 MW (three phases of 75 MW) of PV (tracking or fixed) and/or CPV<br />

(tracking);<br />

• Associated infrastructure including:<br />

o Access roads of 4 – 10 m wide to the PV plant; and<br />

o One main substation with overhead lines.<br />

The following feasible alternatives were considered in the EIR:<br />

Proposed wind energy facility:<br />

• Location alternatives:<br />

o One location for the proposed wind energy facility;<br />

• Activity alternatives:<br />

o Wind energy generation via wind turbines; and<br />

o “No-go” alternative to wind energy production.<br />

• Site layout alternatives:<br />

o One layout alternative per site;<br />

o One main substation location, with two satellite substations.<br />

• Technology alternatives:<br />

o A minimum and maximum tipheight of 100 – 180 m.<br />

o A range of turbine heights.<br />

Proposed solar energy facility:<br />

• Location alternatives:<br />

© <strong>Aurecon</strong> (2012) No unauthorised reproduction, copy<br />

or adaptation, in whole or in part, may be made.<br />

P:\<strong>Projects</strong>\108495 Kangnas WEF & PV EIA's\3 Project Delivery\4 Reports\FEIR\FEIR 210213 <strong>Final</strong>.doc