Proposed Wind and Solar (Photovoltaic) Energy Facilities on Kangnas Farm near Springbok in the Northern Cape: <strong>Final</strong> EIR 20<br />
SECTION 31 OF REGULATION 543<br />
(i) a summary of the key findings of the environmental impact<br />
assessment; and<br />
(ii) a comparative assessment of the positive and negative<br />
implications of the proposed activity and identified alternatives;<br />
CHAPTER<br />
OR<br />
SECTION<br />
(p) a draft environmental management programme containing the aspects<br />
contemplated in regulation 33;<br />
Annexure N<br />
(q) copies of any specialist reports and reports on specialized processes<br />
complying with regulation 32;<br />
(r) any specific information that may be required by the competent authority;<br />
and<br />
(s) any other matters required in terms of sections 24(4)(a) and (b) of the<br />
Act.<br />
Section 31(3) of Regulation 543<br />
The EAP managing the application must provide the competent authority<br />
with detailed, written proof of an investigation as required by Section<br />
24(4)(b)(i) of the Act and motivation if no reasonable or feasible<br />
alternatives, as contemplated in subregulation 31(2)(g), exist.<br />
Annexures<br />
E-M<br />
Annexure O<br />
Chapter 3<br />
and 4<br />
© <strong>Aurecon</strong> (2012) No unauthorised reproduction, copy<br />
or adaptation, in whole or in part, may be made.<br />
P:\<strong>Projects</strong>\108495 Kangnas WEF & PV EIA's\3 Project Delivery\4 Reports\FEIR\FEIR 210213 <strong>Final</strong>.doc