Proposed Wind and Solar (Photovoltaic) Energy Facilities on Kangnas Farm near Springbok in the Northern Cape: <strong>Final</strong> EIR 12<br />

• Integrated <strong>Environmental</strong> Management Guideline Series, Guideline 4: Public<br />

Participation, in support of the EIA Regulations. Unpublished (DEAT, 2005).<br />

• Integrated <strong>Environmental</strong> Management Guideline Series, Guideline 7: Detailed Guide to<br />

Implementation of the <strong>Environmental</strong> Impact Assessment Regulations. Unpublished<br />

(DEAT, 2007).<br />

The following guidelines from the Department of <strong>Environmental</strong> Affairs and Development<br />

Planning (Western Cape) (DEA&DP) were also taken into consideration:<br />

• Brownlie. 2005. Guideline for involving biodiversity specialists in EIA process (June<br />

2005).<br />

• Winter & Baumann. 2005. Guideline for involving heritage specialists in the EIR process<br />

(June 2005).<br />

• Oberholzer. 2005. Guideline for involving visual and aesthetic specialists in the EIR<br />

process (June 2005).<br />

• Guideline for <strong>Environmental</strong> Management Plans (June 2005).<br />

• Guideline for determining the scope of specialist involvement in EIA Processes (June<br />

2005).<br />

• Guideline for the review of specialist input into the EIA Process (June 2005).<br />

• DEA&DP.2011. Guideline on Alternatives, EIA Guideline and Information Document<br />

Series. (DEA&DP, October 2011).<br />

• DEA&DP.2011. Guideline on Need and Desirability, EIA Guideline and Information<br />

Document Series. (DEA&DP, October 2011).<br />

• DEA&DP.2011. Guideline on Public Participation, EIA Guideline and Information<br />

Document Series. (DEA&DP, October 2011).<br />

1.4 APPROACH TO THE PROJECT<br />

As outlined in Figure 1.2 on the overleaf, there are three distinct phases in the EIA process, as<br />

required in terms of NEMA, namely the Initial Application Phase, the Scoping Phase and the<br />

EIA Phase. This report covers the third phase, viz. the EIA Phase.<br />

1.4.1 Initial Application Phase<br />

The Initial Application Phase entailed the submission of two EIA Application Forms to notify<br />

DEA of the project, submitted on 9 May 2012. Acknowledgements of receipts of the EIA<br />

Application Forms were received from DEA on 23 May 2012. The Application Forms and DEA’s<br />

letters of acknowledgement are included in the Scoping Report.<br />

Other tasks undertaken include:<br />

• A Background Information Document (BID) (included in the Scoping Report), in English<br />

and Afrikaans, was sent to key Interested and Affected Parties (I&APs) to inform I&APs<br />

of the proposed projects and to invite I&APs to register on the database by 15 June 2012;<br />

• Advertisements in English and Afrikaans were placed in a local newspaper, Die<br />

Plattelander, on 25 May 2012 notifying the broader public of the initiation of the EIA and<br />

inviting them to register as I&APs. Copies of the advertisements are included in the<br />

Scoping Report; and<br />

© <strong>Aurecon</strong> (2012) No unauthorised reproduction, copy<br />

or adaptation, in whole or in part, may be made.<br />

P:\<strong>Projects</strong>\108495 Kangnas WEF & PV EIA's\3 Project Delivery\4 Reports\FEIR\FEIR 210213 <strong>Final</strong>.doc