04.05.2013 Views

Final EIAR - Aurecon AME Environmental | Environmental Projects

Final EIAR - Aurecon AME Environmental | Environmental Projects

Final EIAR - Aurecon AME Environmental | Environmental Projects

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Proposed Wind and Solar (Photovoltaic) Energy Facilities on Kangnas Farm near Springbok in the Northern Cape: <strong>Final</strong> EIR 42<br />

Figure 3.6: Components of PV technology: (i) Solar cell, (ii) module and (iii) array 19<br />

The proposed solar energy facility (225 MW of PV and/or CPV) would have an approximate<br />

maximum footprint of 800 ha 793 ha. (refer to Figure 3.8).<br />

The arrays and racks are founded into the ground through either concrete, screw or pile<br />

foundations (see Figure 3.10). The arrays are wired to inverters that convert direct current<br />

(DC) into alternate current (AC) that can be fed into a national grid system.<br />

Figure 3.7: below illustrates the components of the process of generating electricity from<br />

solar energy (sun) and fed into the grid.<br />

Short wave<br />

sunrays<br />

PV panels Transmission lines Substation / Grid<br />

19 (Source: http://science.nasa.gov/science-news/science-at-nasa/2002/solarcells/)<br />

© <strong>Aurecon</strong> (2012) No unauthorised reproduction, copy<br />

or adaptation, in whole or in part, may be made.<br />

P:\<strong>Projects</strong>\108495 Kangnas WEF & PV EIA's\3 Project Delivery\4 Reports\FEIR\FEIR 210213 <strong>Final</strong>.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!