Proposed Wind and Solar (Photovoltaic) Energy Facilities on Kangnas Farm near Springbok in the Northern Cape: <strong>Final</strong> EIR 6<br />
Further information on the EIA approach is provided in Section 1.4.4.<br />
Table 1.1.<br />
The consideration of applications within one EIA process is generally acceptable to DEA (pers.<br />
comm. S Vilakazi, 13/09/2011), in order to avoid duplication of information and duplication of<br />
time and effort on DEA’s part in processing the three applications.<br />
Since the proposed projects are based in the Northern Cape, DEA will work closely with the<br />
provincial Department of <strong>Environmental</strong> Affairs and Nature Conservation (DEANC), to ensure<br />
that the provincial environmental concerns are specifically identified and addressed.<br />
Further information on the EIA approach is provided in Section 1.4.4.<br />
Table 1.1: Listed activities in terms of NEMA GN No. 544, 545 and 546, 18 June 2010, to be<br />
authorised for the proposed wind and solar energy facilities and associated substation and grid<br />
connection.<br />
NO. LISTED ACTIVITY WIND RELEVANCY: SOLAR RELEVANCY: WIND AND SOLAR<br />
SUBSTATION &<br />
GRID CONNECTION<br />
RELEVANCY:<br />
GN No. R544, 18 June 2010<br />
10 The construction of facilities or infrastructure<br />
for the transmission and distribution of<br />
electricity -<br />
• outside urban areas or industrial<br />
complexes with a capacity of more<br />
than 33 , but less than 275 kilovolts;<br />
or<br />
• inside urban areas or industrial<br />
complexes with a capacity of<br />
275 kilovolts or more.<br />
11 The construction of:<br />
(iii) bridges;<br />
(x) buildings exceeding 50 square metres in<br />
size; or<br />
(xi) infrastructure or structures covering 50<br />
square metres or more where such<br />
construction occurs within a watercourse or<br />
within 32 metres of a watercourse, measured<br />
from the edge of a watercourse, excluding<br />
where such construction will occur behind the<br />
development setback line.<br />
GN No. R545, 18 June 2010<br />
1 The construction of facilities or<br />
infrastructure for the generation of electricity<br />
where the electricity output is 20 megawatts<br />
or more.<br />
GN No. R546, 18 June 2010<br />
The proposed wind<br />
facility would connect<br />
to the existing on site<br />
grid via 132, 220 or<br />
400 kV powerlines.<br />
A few wetlands and<br />
drainage lines are<br />
scattered across the<br />
proposed site and one<br />
or more roads are<br />
likely to cross these<br />
lines.<br />
The proposed wind<br />
energy facilitiy would<br />
would have a<br />
generation capacity of<br />
560 MW.<br />
The proposed solar<br />
facility would connect to<br />
the existing on site grid<br />
via 132, 220 or 400 kV<br />
powerlines.<br />
A few wetlands and<br />
drainage lines are<br />
scattered across the<br />
proposed site and one or<br />
more roads are likely to<br />
cross these lines.<br />
The proposed solar<br />
energy facility would<br />
have a generation<br />
capacity of 225 MW.<br />
Two substations<br />
would be constructed<br />
to evacuate the<br />
electricity from the<br />
proposed wind and<br />
solar energy facilities.<br />
N/A<br />
N/A<br />
© <strong>Aurecon</strong> (2012) No unauthorised reproduction, copy<br />
or adaptation, in whole or in part, may be made.<br />
P:\<strong>Projects</strong>\108495 Kangnas WEF & PV EIA's\3 Project Delivery\4 Reports\FEIR\FEIR 210213 <strong>Final</strong>.doc