Proposed Wind and Solar (Photovoltaic) Energy Facilities on Kangnas Farm near Springbok in the Northern Cape: <strong>Final</strong> EIR 6<br />

Further information on the EIA approach is provided in Section 1.4.4.<br />

Table 1.1.<br />

The consideration of applications within one EIA process is generally acceptable to DEA (pers.<br />

comm. S Vilakazi, 13/09/2011), in order to avoid duplication of information and duplication of<br />

time and effort on DEA’s part in processing the three applications.<br />

Since the proposed projects are based in the Northern Cape, DEA will work closely with the<br />

provincial Department of <strong>Environmental</strong> Affairs and Nature Conservation (DEANC), to ensure<br />

that the provincial environmental concerns are specifically identified and addressed.<br />

Further information on the EIA approach is provided in Section 1.4.4.<br />

Table 1.1: Listed activities in terms of NEMA GN No. 544, 545 and 546, 18 June 2010, to be<br />

authorised for the proposed wind and solar energy facilities and associated substation and grid<br />

connection.<br />

NO. LISTED ACTIVITY WIND RELEVANCY: SOLAR RELEVANCY: WIND AND SOLAR<br />

SUBSTATION &<br />

GRID CONNECTION<br />

RELEVANCY:<br />

GN No. R544, 18 June 2010<br />

10 The construction of facilities or infrastructure<br />

for the transmission and distribution of<br />

electricity -<br />

• outside urban areas or industrial<br />

complexes with a capacity of more<br />

than 33 , but less than 275 kilovolts;<br />

or<br />

• inside urban areas or industrial<br />

complexes with a capacity of<br />

275 kilovolts or more.<br />

11 The construction of:<br />

(iii) bridges;<br />

(x) buildings exceeding 50 square metres in<br />

size; or<br />

(xi) infrastructure or structures covering 50<br />

square metres or more where such<br />

construction occurs within a watercourse or<br />

within 32 metres of a watercourse, measured<br />

from the edge of a watercourse, excluding<br />

where such construction will occur behind the<br />

development setback line.<br />

GN No. R545, 18 June 2010<br />

1 The construction of facilities or<br />

infrastructure for the generation of electricity<br />

where the electricity output is 20 megawatts<br />

or more.<br />

GN No. R546, 18 June 2010<br />

The proposed wind<br />

facility would connect<br />

to the existing on site<br />

grid via 132, 220 or<br />

400 kV powerlines.<br />

A few wetlands and<br />

drainage lines are<br />

scattered across the<br />

proposed site and one<br />

or more roads are<br />

likely to cross these<br />

lines.<br />

The proposed wind<br />

energy facilitiy would<br />

would have a<br />

generation capacity of<br />

560 MW.<br />

The proposed solar<br />

facility would connect to<br />

the existing on site grid<br />

via 132, 220 or 400 kV<br />

powerlines.<br />

A few wetlands and<br />

drainage lines are<br />

scattered across the<br />

proposed site and one or<br />

more roads are likely to<br />

cross these lines.<br />

The proposed solar<br />

energy facility would<br />

have a generation<br />

capacity of 225 MW.<br />

Two substations<br />

would be constructed<br />

to evacuate the<br />

electricity from the<br />

proposed wind and<br />

solar energy facilities.<br />

N/A<br />

N/A<br />

© <strong>Aurecon</strong> (2012) No unauthorised reproduction, copy<br />

or adaptation, in whole or in part, may be made.<br />