48 / MRCB annual report 2011 /<br />
CHAIRMAN’S STATEMENT<br />
improve quality of life for <strong>the</strong> Brickfi elds community. MRCB<br />
estimates that <strong>the</strong> project, scheduled to be constructed within<br />
<strong>the</strong> next three years, has a GDV of over RM1 billion.<br />
Meanwhile, <strong>the</strong> Group continued to seek new works under <strong>the</strong><br />
Government initiative to develop Greater Kuala Lumpur - an<br />
important element of <strong>the</strong> Economic Transformation Programme<br />
(ETP) unveiled in 2010. With a proven record of delivering<br />
successful urban transportation development like KL Sentral,<br />
<strong>the</strong> Group is keen to be part of <strong>the</strong> team to jointly develop <strong>the</strong><br />
upcoming Rubber Research Institute l<strong>and</strong> in Sg. Buloh.<br />
Engineering & Construction Division<br />
The highlight for <strong>the</strong> Engineering & Construction division in 2011<br />
was <strong>the</strong> RM1.33 billion contract secured for <strong>the</strong> Ampang LRT<br />
extension line project via its wholly owned subsidiary company,<br />
MRCB Engineering Sdn Bhd (MESB) in August 2011.<br />
Winning this major contract in <strong>the</strong> face of fi erce competition is<br />
a testament to our capabilities <strong>and</strong> experience in carrying out<br />
major infrastructure projects. With a construction value of RM1.33<br />
billion, <strong>the</strong> award has doubled our construction order book to<br />
about RM2.6 billion, <strong>and</strong> is expected to contribute positively to<br />
our revenue <strong>and</strong> earnings growth from 2012 onwards.<br />
On top of this, MESB also secured a sub-contract works, worth<br />
RM67.2 million from Sunway Construction Sdn Bhd for <strong>the</strong><br />
fabrication <strong>and</strong> delivery of segmental box girders for <strong>the</strong> Kelana<br />
Jaya LRT extension.<br />
Our KL Sentral development also made fur<strong>the</strong>r progress, with<br />
projects at various stages of completion. Lot E, also known as KL<br />
Sentral Park, was completed in <strong>the</strong> last quarter of 2011 while<br />
348 Sentral, CIMB Investment Bank headquarters (Lot A) <strong>and</strong> Nu<br />
Sentral Lifestyle retail mall, as well as two offi ces <strong>and</strong> a hotel at<br />
Lot G are progressing well <strong>and</strong> according to schedule. We also<br />
began works for Q Sentral (Lot B) <strong>and</strong> The Sentral Residences (Lot<br />
D) in 2011. The experience we have gained in this upscale, highrise<br />
residential, offi ce <strong>and</strong> retail complex with its pioneering use<br />
of green technology has reinforced our st<strong>and</strong>ing as a leading<br />
player in Malaysia’s engineering <strong>and</strong> construction sector.<br />
In Johor, 2011 also saw <strong>the</strong> completion of both <strong>the</strong> EDL<br />
Expressway <strong>and</strong> <strong>the</strong> Permai Psychiatric Hospital in Tampoi, while<br />
work is on-going on <strong>the</strong> construction of Marlborough College<br />
East in B<strong>and</strong>ar Baru Nusajaya - part of <strong>the</strong> Isk<strong>and</strong>ar Malaysia<br />
Development project.<br />
Infrastructure, Concession <strong>and</strong> Environmental Division<br />
In October 2011, MRCB was awarded a contract worth RM46.50<br />
million from <strong>the</strong> Department of Irrigation <strong>and</strong> Drainage for a<br />
project in <strong>the</strong> State of Pahang. The award is for an extension<br />
of <strong>the</strong> RM259.4 million contract to upgrade <strong>the</strong> Sungai Pahang<br />
river <strong>and</strong> estuary that <strong>the</strong> company gained in October 2008.The<br />
main component of <strong>the</strong> project, which should be completed<br />
within 17 months, is to extend <strong>the</strong> breakwater by an additional<br />
200 metres.<br />
A month later, we secured ano<strong>the</strong>r contract worth RM40.3<br />
million from <strong>the</strong> Department of Irrigation <strong>and</strong> Drainage to carry<br />
out coastal protection works at <strong>the</strong> Sungai Perai river mouth<br />
<strong>and</strong> nearby coastal areas. The scope of work includes beach<br />
rehabilitation, construction of a jetty, boat mooring facilities <strong>and</strong><br />
related works - all areas in which we have proven strengths. The<br />
construction period for <strong>the</strong> contract is 15 months, with scheduled<br />
completion set for March 2013.<br />
Meanwhile, in April, MRCB in collaboration with Dewan<br />
B<strong>and</strong>araya Kuala Lumpur <strong>and</strong> Ekovest Bhd launched <strong>the</strong> River<br />
of Life Inter<strong>nation</strong>al Master planning competition. The aim of <strong>the</strong><br />
competition is to challenge planners to devise a master plan for<br />
a 10.7 km stretch of <strong>the</strong> Klang <strong>and</strong> Gombak river corridor that will<br />
rehabilitate <strong>and</strong> beautify <strong>the</strong> river, transforming <strong>the</strong> waterfront<br />
into an asset with high economic <strong>and</strong> aes<strong>the</strong>tic value.<br />
Building Services Division<br />
Both for transport hubs <strong>and</strong> for o<strong>the</strong>r property assets, our<br />
Building Services Division delivers comprehensive, integrated,<br />
top quality parking, security, maintenance <strong>and</strong> building<br />
management solutions.