SRK Consulting: Project No: 439414 <strong>Staatsolie</strong> Pipeline <strong>EIA</strong> – Draft <strong>EIA</strong> Report Page 84<br />
Table 6-16: Project-specific management and mitigation measures that must be implemented during operations<br />
Operations phase mitigation measures<br />
Aspect ID Mitigation measure / Procedure Responsible Implementation<br />
Timeframe<br />
Pipeline<br />
maintenance<br />
Leak<br />
prevention<br />
1. • Develop and implement a pipeline monitoring programme<br />
in line with international standards.<br />
2. • Ensure that the structural integrity of the pipeline is<br />
regularly monitored, e.g. through pigging.<br />
3. • Maintain the cathodic protection system of the pipelines in<br />
working order at all times.<br />
4. • Perform regular internal and external audits of the pipeline<br />
monitoring programme to ensure it is implemented<br />
effectively.<br />
5. • Develop (or adapt and implement) a detailed pipeline spill<br />
management prevention and response plan for the various<br />
products conveyed through the pipelines, addressing:<br />
- Pipeline and product monitoring systems;<br />
- Notification and reporting procedures;<br />
- Investigation procedures;<br />
- Measures to halt the spill;<br />
- Spill containment and removal procedures; and<br />
- Clean up procedures.<br />
6. • Operate pipelines in line with international standards and<br />
design criteria to minimise the risk of pipeline failure.<br />
7. • Ensure that product flow is continuously monitored, to<br />
detect and ensure no produce is lost due to leakage.<br />
8. • Consider installing monitoring wells / boreholes above the<br />
shallow sections of the pipelines, which are exposed to the<br />
greatest stresses, to periodically monitor soil for any<br />
leakages.<br />
9. • Ensure staff is adequately trained in the operation of the<br />
pipeline.<br />
• Conduct regular spill response exercises.<br />
• <strong>Staatsolie</strong> Refining<br />
Operations Manager<br />
• <strong>Staatsolie</strong> Refining<br />
Operations Manager<br />
• Before pipeline<br />
becomes operational<br />
Monitoring Methods Performance Indicators<br />
• Review monitoring<br />
programme<br />
• Throughout operations • Regularly review<br />
pigging schedule and<br />
results<br />
• Before pipeline<br />
becomes operational<br />
• Regularly review<br />
system<br />
• Regularly review audit<br />
reports and schedule<br />
• Throughout operations • Regular review of<br />
operations<br />
• Compliance with<br />
international standards<br />
• Capacity to implement<br />
programme<br />
• Problems identified<br />
• Functionality of system<br />
• Compliance with audit<br />
schedule<br />
• Outcome of audits<br />
• Review plan • Compliance with<br />
international standards<br />
• Regularly review logs of<br />
pipeline operation<br />
• Capacity to implement<br />
plan<br />
• Number and type of<br />
incidents<br />
• Volume of product lost<br />
• Result of investigation<br />
• Inspect monitoring wells • Results from wells<br />
• Review training<br />
schedule<br />
• Keep attendance<br />
registers and results<br />
• Compliance with<br />
standards<br />
• Percentage of staff<br />
adequately trained<br />