SRK Consulting: Project No: 439414 <strong>Staatsolie</strong> Pipeline <strong>EIA</strong> – Draft <strong>EIA</strong> Report Page 84<br />

Table 6-16: Project-specific management and mitigation measures that must be implemented during operations<br />

Operations phase mitigation measures<br />

Aspect ID Mitigation measure / Procedure Responsible Implementation<br />

Timeframe<br />

Pipeline<br />

maintenance<br />

Leak<br />

prevention<br />

1. • Develop and implement a pipeline monitoring programme<br />

in line with international standards.<br />

2. • Ensure that the structural integrity of the pipeline is<br />

regularly monitored, e.g. through pigging.<br />

3. • Maintain the cathodic protection system of the pipelines in<br />

working order at all times.<br />

4. • Perform regular internal and external audits of the pipeline<br />

monitoring programme to ensure it is implemented<br />

effectively.<br />

5. • Develop (or adapt and implement) a detailed pipeline spill<br />

management prevention and response plan for the various<br />

products conveyed through the pipelines, addressing:<br />

- Pipeline and product monitoring systems;<br />

- Notification and reporting procedures;<br />

- Investigation procedures;<br />

- Measures to halt the spill;<br />

- Spill containment and removal procedures; and<br />

- Clean up procedures.<br />

6. • Operate pipelines in line with international standards and<br />

design criteria to minimise the risk of pipeline failure.<br />

7. • Ensure that product flow is continuously monitored, to<br />

detect and ensure no produce is lost due to leakage.<br />

8. • Consider installing monitoring wells / boreholes above the<br />

shallow sections of the pipelines, which are exposed to the<br />

greatest stresses, to periodically monitor soil for any<br />

leakages.<br />

9. • Ensure staff is adequately trained in the operation of the<br />

pipeline.<br />

• Conduct regular spill response exercises.<br />

• <strong>Staatsolie</strong> Refining<br />

Operations Manager<br />

• <strong>Staatsolie</strong> Refining<br />

Operations Manager<br />

• Before pipeline<br />

becomes operational<br />

Monitoring Methods Performance Indicators<br />

• Review monitoring<br />

programme<br />

• Throughout operations • Regularly review<br />

pigging schedule and<br />

results<br />

• Before pipeline<br />

becomes operational<br />

• Regularly review<br />

system<br />

• Regularly review audit<br />

reports and schedule<br />

• Throughout operations • Regular review of<br />

operations<br />

• Compliance with<br />

international standards<br />

• Capacity to implement<br />

programme<br />

• Problems identified<br />

• Functionality of system<br />

• Compliance with audit<br />

schedule<br />

• Outcome of audits<br />

• Review plan • Compliance with<br />

international standards<br />

• Regularly review logs of<br />

pipeline operation<br />

• Capacity to implement<br />

plan<br />

• Number and type of<br />

incidents<br />

• Volume of product lost<br />

• Result of investigation<br />

• Inspect monitoring wells • Results from wells<br />

• Review training<br />

schedule<br />

• Keep attendance<br />

registers and results<br />

• Compliance with<br />

standards<br />

• Percentage of staff<br />

adequately trained<br />

REUT/DALC 439414_<strong>Staatsolie</strong>Pipeline<strong>EIA</strong>_Draft <strong>EIA</strong> Report_Final June 2012