SRK Consulting: Project No: 439414 <strong>Staatsolie</strong> Pipeline <strong>EIA</strong> – Draft <strong>EIA</strong> Report Page 62<br />

• Emissions of exhaust fumes from construction equipment will be concentrated at the drill pads,<br />

which are located in industrial areas near the river, where fumes will be relatively quickly<br />

dispersed and impact few people;<br />

• Impacts from the construction phase will be very short-term.<br />

During operation, any potential impacts of the project on air quality are considered insignificant, as:<br />

• The pipeline will mostly lie underground and not release emissions to the air;<br />

• Earthworks will not be required for maintenance of the pipeline or corridor; and<br />

• The emissions associated with the operation of pumps to move the product in the pipelines are<br />

expected to be minimal compared to the other industrial emissions in the area.<br />

It must be noted that the above assessment is based on the assumption that the following measures<br />

are implemented in the project design, construction and operation phases:<br />

• Maintain all generators, vehicles, vessels and other equipment in good working order to<br />

minimise exhaust fumes; and<br />

• Cover stockpiles of dry, loose material with netting or similar to avoid dust, especially during<br />

windy and dry conditions.<br />

6.2.4 Noise and vibration impacts<br />

Detailed noise measurements are not available for the study area 30 , but are likely to vary depending<br />

on the land use in specific locations. Land use varies from vacant and vegetated plots (where noise<br />

will be dominated by more natural sounds of birds and frogs) to residential areas (characterised by<br />

traffic, dogs barking, household noise etc) and industrial activities (where noise levels might be<br />

comparable to those measured at the <strong>Staatsolie</strong> refinery). 2009 measurements in the vicinity of the<br />

<strong>Staatsolie</strong> refinery indicated that current ambient noise levels in residential, commercial and<br />

industrial areas lie below guideline levels stipulated by the IFC.<br />

During construction, potential sources of noise and vibration impacts include drilling activities at the<br />

pipeline entry / exit points, activities at the pipeline assembly area, construction activities along the<br />

trenching and pipe rack sections and construction vehicles and vessels. The magnitude of potential<br />

noise and vibration impacts from the above sources is considered insignificant, as:<br />

• Most activities will take place at a few discrete points over the 6 km long pipeline corridor, within<br />

areas already used for industrial purposes and at considerable distance from residential areas 31 ;<br />

• There are only five drill locations, spread over an approximately 6 km long corridor;<br />

• The use of a 250 tonne drill (such as the one proposed for this project) in close proximity of<br />

residences for other HDD operations did not cause any vibration-related complaints (Southern<br />

Water, not dated);<br />

• Vibrations caused by heavy trucks at nearby structures may create annoyance but are unlikely to<br />

cause damage; such vibrations would not be unusual in the area as heavy trucks already use<br />

roads in the area;<br />

30 As noise impacts from the pipeline project are considered to be insignificant, baseline noise measurements were not<br />

undertaken for this <strong>EIA</strong>.<br />

31 The nearest residence to any drill pad is located approximately 200 m from the pad near Suritex. At all other drill pads,<br />

residences are located at least 500 m from the site. In general, only people living within 100 m of the site boundary are likely<br />

to be seriously impacted by construction noise.<br />

REUT/DALC 439414_<strong>Staatsolie</strong>Pipeline<strong>EIA</strong>_Draft <strong>EIA</strong> Report_Final June 2012