SRK Consulting: Project No: 439414 <strong>Staatsolie</strong> Pipeline <strong>EIA</strong> – Draft <strong>EIA</strong> Report Page 89<br />

Aspect ID Measure / Procedure Responsible Implementation<br />

timeframe<br />

22. • Notify relevant authorities and adjacent land owners when<br />

decommissioning and rehabilitation are completed.<br />

Monitoring methods Performance indicators<br />

• Review notifications<br />

sent<br />

General 23. • Provide adjacent landowners with contact details to register • <strong>Staatsolie</strong> Refining • Before the end of<br />

any observations and complaints following decommissioning. Operations Manager decommissioning<br />

24. • Clarify issues of residual liability before relinquishment.<br />

or as determined in<br />

detailed<br />

Decommissioning<br />

Plan<br />

• Review results of<br />

study.<br />

POST CLOSURE<br />

Monitoring 25. • Monitor or audit abandoned pipeline(s) for a specified period<br />

following decommissioning as agreed with the authorities for:<br />

- Subsidence<br />

- Rehabilitation success<br />

- Any other aspects, as agreed with relevant parties<br />

• <strong>Staatsolie</strong> Refining<br />

Operations Manager<br />

or as determined in<br />

detailed<br />

Decommissioning<br />

Plan<br />

• After<br />

decommissioning /<br />

rehabilitation for a<br />

period as agreed<br />

• Review monitoring<br />

protocol, progress and<br />

results<br />

• Completion of all<br />

requirements<br />

REUT/DALC 439414_<strong>Staatsolie</strong>Pipeline<strong>EIA</strong>_Draft <strong>EIA</strong> Report_Final June 2012