1 INTRODUCTION<br />

NON‐TECHNICAL SUMMARY<br />

<strong>EIA</strong> FOR THE CONSTRUCTION OF DIESEL, GASOLINE AND LPG PIPELINES:<br />

<strong>Staatsolie</strong> Maatschappij Suriname N.V. (<strong>Staatsolie</strong>) is<br />

currently expanding the refinery at Tout Lui Faut, about<br />

5 km south of Paramaribo. As part of the refinery<br />

expansion, <strong>Staatsolie</strong> proposes to construct three new<br />

pipelines to take Liquefied Petroleum Gas (LPG) from<br />

OGANE to the refinery and to take diesel and gasoline from<br />

the refinery to the SOL and Suritex depots.<br />

SRK Consulting (South Africa) (Pty) Ltd (SRK) was appointed<br />

by <strong>Staatsolie</strong> as independent consultants to undertake the<br />

Environmental Impact Assessment (<strong>EIA</strong>) process for the<br />

proposed pipelines, in line with the Draft Environmental<br />

Act of 2002 and the Environmental Assessment Guidelines<br />

(August 2009) issued by the Nationaal Instituut voor Milieu<br />

en Ontwikkeling in Suriname (NIMOS).<br />

2 LEGAL REQUIREMENTS<br />

Suriname does not have approved environmental<br />

legislation, although it is currently being developed and<br />

guidelines for environmental assessment have been<br />

released. The <strong>EIA</strong> process for the proposed pipeline project<br />

will comply with the guidelines and other relevant<br />

legislation.<br />

In addition the <strong>EIA</strong> process will be guided by international<br />

best practice, notably standards and guidelines of the<br />

World Bank Group.<br />

<strong>Staatsolie</strong>’s Health, Safety and Environment (HSE) Policy<br />

and Management System have also guided the <strong>EIA</strong> .<br />

3 PROJECT DESCRIPTION<br />

The project includes the construction of three<br />

underground pipelines between the <strong>Staatsolie</strong> refinery at<br />

Tout Lui Faut and Suritex, via the SOL and OGANE sites:<br />

• One diesel and one gasoline pipeline to convey diesel<br />

and gasoline from the <strong>Staatsolie</strong> refinery to SOL and<br />

Suritex; and<br />

• One LPG pipeline to convey LPG from OGANE to the<br />

<strong>Staatsolie</strong> refinery.<br />

<strong>EIA</strong> REPORT<br />

For most of the route, the pipelines will be installed<br />

underneath the western bank of the Suriname River, using<br />

horizontal directional drilling. Continuous sections of up to<br />

1.64 km will be drilled. Drilling entry and/or exit points will<br />

be located at the surface, from where the drill operates<br />

and the pipelines are pulled into the drill hole (see Figure<br />

1). At these points, the pipelines will lie approximately 3 m<br />

below the surface. Between entry and exit points, the<br />

pipelines are expected to lie up to 30 m below the riverbed<br />

(see Figure 2).<br />

Figure 1: Figures showing HDD (top), drilling (middle) and<br />

insertion of pipeline into the drill hole (bottom)<br />

4 ENVIRONMENTAL PROCESS<br />

An <strong>EIA</strong> is a process to identify and assess environmental<br />

effects of a proposed project. The <strong>EIA</strong> process has two<br />

main phases: the Scoping Phase and the Impact<br />

Assessment Phase (the current phase) (see Figure 3).<br />

The purpose of the <strong>EIA</strong> is to:<br />

• Document existing conditions in the study area and the<br />

socio‐economic conditions of affected communities;<br />

• Assess the environmental and socio‐economic impacts<br />

that may result from the project;<br />

• Inform and obtain contributions from stakeholders,<br />

including relevant authorities and the public, and address<br />

their relevant issues and concerns;<br />